[1]刘建,钱世波,张洋荣,等.重庆巫溪县刘家沟水电站工程初步设计报告[R].重庆:重庆三峡水电建筑勘察设计研究院,2008.
[2]南京水利科学研究院,水利水电科学研究院.水工模型试验[M].2版.北京:水利水电出版社,1985.
[3]王玄,王均星,崔金秀.龙背湾溢洪道进水渠导水墙体型优化试验研究[J].中国农村水利水电,2009(7):100-102.
WANG Xuan,WANG Jun-xing,CUI Jin-xiu.Experimental re-search on form optimization for guide wall near the spillway inlet ofLongbeiwan hydropower project[J].China Rural Water and Hy-dropower,2009(7):100-102.
[4]胡鹏飞,袁观栋.刘家沟水电站溢洪道进口导墙体型优化试验研究[J].吉林水利,2011(1):25-27.
HU Peng-fei,YUAN Guan-dong.Experimental research on formoptimization for guide wall near the spillway entrance channel ofLiujiagou Hydropower Project[J].Jilin Water Resources,2011(1):25-27.
[5]宋永嘉,田林钢,李河.溢洪道进水渠进口形式试验研究[J].人民黄河,2005,27(9):56-57.
SONG Yong-jia,TIAN Lin-gang,LI He.Experimental research onentrance channel form of spillway[J].Yellow River,2005,27(9):56-57.
[6]DL/T 5166—2002溢洪道设计规范[S].北京:中国电力出版社,2002.
[7]张建民,杨永全,许唯临,等.宽浅式溢洪道急流控制及下游冲刷试验研究[J].四川大学学报:工程科学版,2004.36(2):17-20.
ZHANG Jian-min,YANG Yong-quan,XU Wei-lin,et al.Investi-gation of torrent shock in the spillway and characteristics of scour[J].Journal of Sichuan University:Engineering Science Edition,2004,36(2):17-20.
[8]付旭辉,杨胜发,刘良军,等.羊头铺水电站水工模型试验研究[J].小水电,2008,139(1):11-14.
FU Xu-hui,YANG Sheng-fa,LIU Liang-jun,et al.Experimentalresearch on Sheep head shop hydropower hydraulic model[J].Small Hydropower,2008,139(1):11-14.
[9]胡鹏,胡江.中咀坡水电工程溢洪道水工模型试验研究[J].重庆交通大学学报:自然科学版,2010,29(5):813-815.
HU Peng,HU Jiang.Experimental study on the hydraulic model ofspillway in Zhongzuipo hydroelectric power projects\[J\].Journalof Chongqing Jiaotong University:Natural Science,2010,29(5):813-815.
|