Abstract:According to the design principle of the pretensioned prestressing, the structural design of large-tonnage pre-tensioned prefabricated platform was carried
out. The design and calculation method of the key parts in prestressing column and abutments were introduced. Especially, the structural design of the 1 500 t large-
tonnage pressure abutments in Xinhui district of Guangdong was emphasized. The whole mechanical performance of the platform structure was analyzed by ANSYS software.
The key parts of bracket in the abutment were tested in the field in order to compare and analyze its mechanical performance and the comparison analysis of its
mechanical performance was also carried out. Finally, its safety and reliability were verified. The above research is of practical reference for promoting the
construction technology of the large-tonnage pretensioned precast concrete platform.
[1] 冯会芳,王有金.谈天津港南疆新建构件预制厂设计思路[J].港工技术,2005(2):28-29.
FENG Huifang,WANG Youjin.The design thought of Nanjiang new precast components factory in Tianjin harbor [J].Port Engineering Technology,2005(2):28-29.
[2] 沈阳云.东海大桥回填海滩区域钢桩码头设计与施工[J].施工技术,2004,33(5):64-66.
SHEN Yangyun.Design and construction of the steel pile wharf in Donghai great bridge beach-backfill area [J].Construction Technology,2004,33(5):64-66.
[3] 秦振华,陈国栋.大直径PHC桩在沿海地基处理中的应用[J].工业建筑,2014,44(增刊1):604-607.
QIN Zhenhua,CHEN Guodong.Application of large diameter PHC piles in treatments of the foundations of seaboard areas [J].Industrial Construction,2014,44(Sup1):604-
607.
[4] 陈绍华,陈清冰.瓜达尔港口项目施工技术总结[J].华南港工,2004(3):6-16.
CHEN Shaohua,CHEN Qingbing.Technology for construction works for Gwadar port [J].South China Harbor Engineering,2004(3):6-16.
[5] 陈斌,陈光福,秦体达.先张法墩板式张拉台座的设计与研究[J].水运工程,2001(7):8-13.
CHEN Bin,CHEN Guangfu,QIN Tida.Design and study of Pier plate stretching bed under pretensioned prestress method [J].Port & Waterway Engineering,2001(7):8-13.
[6] 周加胜,魏玉峰,李树东.新型先张法台座的制作及张拉工艺的改进[J].山东交通科技,2002(2):35-36.
ZHOU Jiasheng,WEI Yufeng,LI Shudong.The manufacture of new type of pretension prestressing platform and improvement of tensioning technology [J].Shandong
Communication Science and Technology,2002(2):35-36.
[7] 孟祥马.先张法预应力台座的设计要点[J].黑龙江交通科技,2010(7):122-123.
MENG Xiangma.The design key points of pretension prestressing platform [J].Heilongjiang Communications Science and Technology,2010(7):122-123.
[8] 汤永辉.珠海港高桩码头先张法预应力构件预制场的设计与施工[J].港口工程,1997(4):42-45.
TANG Yonghui.Design and construction of pretension prestressing platform for precast components in Zhuhai harbor with long piled wharf [J].Harbor Engineering,1997
(4):42-45.
[9] 李锡胤.弹性地基梁的稳定计算——先张法预应力台座的稳定问题[J].港口工程,1996(5):24-28.
LI Xiyin.The stability problem of beam on elastic foundation:Stability problem of pretension prestressing platform [J].Harbor Engineering,1996(5):24-28.
[10]向波,庄卫林,何云勇,等.小直径钢管排桩水平极限承载力现场试验研究[J].重庆交通大学学报(自然科学版),2015,34(1):78-83.
XIANG Bo,ZHUANG Weilin,HE Yunyong,et al.Field tests on horizontal ultimate bearing capacity of small diameter steel pipe rowed piles [J].Journal of Chongqing
Jiaotong University(Natural Science),2015,34(1):78-83.
[11]彭凯,于丛丛.非均匀预应力筋束非线性松弛损失研究[J].重庆交通大学学报(自然科学版),2014,33(3):1-5.
PENG Kai,YU Congcong.Non-linear relaxation loss of non-uniform prestressing steel bundles [J].Journal of Chongqing Jiaotong University(Natural Science),2014,33(3):1
-5.
[12]陈波,赵晓波.轨道交通预应力混凝土槽型梁有限元分析[J].重庆交通大学学报(自然科学版),2011,30(增刊2):1241-1245.
CHEN Bo,ZHAO Xiaobo.Finite element analysis of U-shaped beam of prestressed concrete used in rail transit [J].Journal of Chongqing Jiaotong University(Natural