[1] 冯会芳,王有金.谈天津港南疆新建构件预制厂设计思路[J].港工技术,2005(2):28-29.
FENG Huifang,WANG Youjin.The design thought of Nanjiang new precast components factory in Tianjin harbor [J].Port Engineering Technology,2005(2):28-29.
[2] 沈阳云.东海大桥回填海滩区域钢桩码头设计与施工[J].施工技术,2004,33(5):64-66.
SHEN Yangyun.Design and construction of the steel pile wharf in Donghai great bridge beach-backfill area [J].Construction Technology,2004,33(5):64-66.
[3] 秦振华,陈国栋.大直径PHC桩在沿海地基处理中的应用[J].工业建筑,2014,44(增刊1):604-607.
QIN Zhenhua,CHEN Guodong.Application of large diameter PHC piles in treatments of the foundations of seaboard areas [J].Industrial Construction,2014,44(Sup1):604-
607.
[4] 陈绍华,陈清冰.瓜达尔港口项目施工技术总结[J].华南港工,2004(3):6-16.
CHEN Shaohua,CHEN Qingbing.Technology for construction works for Gwadar port [J].South China Harbor Engineering,2004(3):6-16.
[5] 陈斌,陈光福,秦体达.先张法墩板式张拉台座的设计与研究[J].水运工程,2001(7):8-13.
CHEN Bin,CHEN Guangfu,QIN Tida.Design and study of Pier plate stretching bed under pretensioned prestress method [J].Port & Waterway Engineering,2001(7):8-13.
[6] 周加胜,魏玉峰,李树东.新型先张法台座的制作及张拉工艺的改进[J].山东交通科技,2002(2):35-36.
ZHOU Jiasheng,WEI Yufeng,LI Shudong.The manufacture of new type of pretension prestressing platform and improvement of tensioning technology [J].Shandong
Communication Science and Technology,2002(2):35-36.
[7] 孟祥马.先张法预应力台座的设计要点[J].黑龙江交通科技,2010(7):122-123.
MENG Xiangma.The design key points of pretension prestressing platform [J].Heilongjiang Communications Science and Technology,2010(7):122-123.
[8] 汤永辉.珠海港高桩码头先张法预应力构件预制场的设计与施工[J].港口工程,1997(4):42-45.
TANG Yonghui.Design and construction of pretension prestressing platform for precast components in Zhuhai harbor with long piled wharf [J].Harbor Engineering,1997
(4):42-45.
[9] 李锡胤.弹性地基梁的稳定计算——先张法预应力台座的稳定问题[J].港口工程,1996(5):24-28.
LI Xiyin.The stability problem of beam on elastic foundation:Stability problem of pretension prestressing platform [J].Harbor Engineering,1996(5):24-28.
[10]向波,庄卫林,何云勇,等.小直径钢管排桩水平极限承载力现场试验研究[J].重庆交通大学学报(自然科学版),2015,34(1):78-83.
XIANG Bo,ZHUANG Weilin,HE Yunyong,et al.Field tests on horizontal ultimate bearing capacity of small diameter steel pipe rowed piles [J].Journal of Chongqing
Jiaotong University(Natural Science),2015,34(1):78-83.
[11]彭凯,于丛丛.非均匀预应力筋束非线性松弛损失研究[J].重庆交通大学学报(自然科学版),2014,33(3):1-5.
PENG Kai,YU Congcong.Non-linear relaxation loss of non-uniform prestressing steel bundles [J].Journal of Chongqing Jiaotong University(Natural Science),2014,33(3):1
-5.
[12]陈波,赵晓波.轨道交通预应力混凝土槽型梁有限元分析[J].重庆交通大学学报(自然科学版),2011,30(增刊2):1241-1245.
CHEN Bo,ZHAO Xiaobo.Finite element analysis of U-shaped beam of prestressed concrete used in rail transit [J].Journal of Chongqing Jiaotong University(Natural
Science),2011,30(Sup2):1241-1245. |