Construction Method for Mining for Shallow Tunnels with Pebble SoilLayer

WEI Longhai1, LI Dongsheng1, LU Junfu2   

  1. 1.The Second Highway Survey, Design and Research Institute, China Communications, Wuhan 430056, Hubei, China;2.State Key Laboratory of Geohazard Prevention and Geoenvironment Protection, Chengdu University of Technology,Chengdu 610059, Sichuan, China;
  • Received:2010-10-25 Revised:2011-03-04 Online:2011-04-15 Published:2015-03-12

卵石地层浅埋暗挖地铁隧道施工工法研究

魏龙海1,李东升1,路军富2   

  1. 1.中交第二公路勘察设计研究院有限公司, 湖北武汉430056; 2.成都理工大学地质灾害防治与地质环境保护国家重点实验室, 四川成都610059
  • 作者简介:魏龙海(1979 — ),男,安徽太和人,工程师,博士,主要从事隧道及地下工程设计和研究。E-mail:wlh0902@163.com。

Abstract: Based on the test section by mining method for shallow Tunnels of Chengdu Subway Line 1, discrete element method and field measurement data were employed to study construction method for mining for shallow tunnels with pebble soil layer. The result indicated in pebble soil layer, settlement of earths surface by bench method was bigger than that by the CD method; monitoring of the deformation of support should be conducted frequently. Due to the complexity of CD method, larger construction disturbance and self stability without disturbance, it was suggested that priority should be given to the bench method

Key words: pebble soil mining for shallow tunnels, field measurement, granular distinct element method

摘要: 以成都地铁1号线工程天府广场北侧暗挖试验段为例,采用颗粒流数值分析方法,根据现场量测数据,对砂 卵石地层浅埋暗挖地铁隧道进行了施工工法研究。研究认为:在卵石土层中,采用台阶法施工引起的地表沉降量 略大于CD法,应加强对支护结构变形的监测。考虑到CD法施工工序复杂,施工扰动比台阶法大,而且卵石地层 在未扰动条件下的自稳性较好,因此应优先考虑台阶法施工。

关键词: 卵石土, 浅埋暗挖隧道, 现场量测, 颗粒离散元