[1]沈金安.改性沥青与SMA路面[M].北京:人民交通出版社,1999.
[2]周研,于永生,张国强,等.废塑料改性沥青的性能研究[J].石油沥青,2007,21(4):6-9.
ZHOU Yan,YU Yong-sheng,ZHANG Guo-qiang,et al.Perform-ance study of modified asphalt by the waste-PE[J].Petroleum As-phalt,2007,21(4):6-9.
[3]赵可,杜月宗.PE复合改性沥青技术研究[J].重庆交通大学学报:自然科学版,2010,29(6):907-911.
ZHAO Ke,DU Yue-zong.Research on the technique of PE com-posite modified asphalt[J].Journal of Chongqing Jiaotong Univer-sity:Natural Science,2010,29(6):907-911.
[4]杨锡武,刘克,杨大田.PE改性沥青的几个问题[J].中外公路,2008,28(6):203-207.
YANG Xi-wu,LIU Ke,YANG Da-tian.Several problems in modi-fied asphalt with polyethylene[J].Journal of China and ForeignHighway,2008,28(6):203-207.
[5]张争齐,张登良.聚乙烯改性沥青研究[J].中国公路学报,1996,9(3):14-19.
ZHANG Zhen-qi,ZHANG Deng-liang.A study of polyethylenemodified bitumen[J].China Journal of Highway and Transport,1996,9(3):14-19.
[6]Ali A Y.Polyethylene dispersions in bitumen:the effects of thepolymer structural parameters[J].Journal of Applied Polymer Sci-ence,2003,90:3183-3190.
[7]张敏.NOVOPHALT改性沥青路面质量的控制技术[J].中外公路,2004,24(4):39-42.
ZHANG Ming.Control technology of NOVOPHALT modified as-phalt pavement quality[J].Journal of China and Foreign Highway,2004,24(4):39-42.
[8]蒋兴华.生活废旧塑料改性沥青性能试验研究[D].重庆:重庆交通大学,2010.
[9]JTJ052—2000公路工程沥青与沥青混合料试验规程[S].北京:人民交通出版社,2001.
[10]JTG F40—2004公路沥青路面施工技术规范[S].北京:人民交通出版社,2004.
[11]刘克,杜洁.聚合物-沥青反应性共混母料改性沥青技术原理[J].新型建筑材料,2009(6):74-77.
LIU Ke,DU Jie.Technical principle of polymer-asphalt reactiveblending master batch for producing modified asphalt[J].NewBuilding Materials,2009(6):74-77.
|