[1]郝岭,谭先泽,吴文凤.山区河流船闸设计最高通航水位研究[J].水运工程,2005(4):52-55.
HAO Ling,TAN Xian-ze,WU Wen-feng.Designed highest naviga-ble stage of shiplock in mountainous river[J].Port&WaterwayEngineering,2005(4):52-55.
[2]罗斌.乌江银盘水电站预泄调度研究[J].人民长江,2008(2):8-13.LUO Bing.Pre-discharge research of Wujiang yinpan hydropowerstation[J].Yangtze River,2008(2):8-13.
[3]赖茂存.河道水文条件变化对最低通航水位的影响[J].中国水运,2009(5):24-25.
LAI Mao-cun.River hydrological conditions change on the influ-ence of the lowest navigable water level[J].China Water Ttans-port,2009(5):24-25.
[4]GB50139—2004内河通航标准[S].北京:中华人民共和国建设部,中华人民共和国家质量监督检验检疫总局,2004.
[5]SL104—95水利工程水利计算规范[S].北京:中华人民共和国水利部布,1995.
[6]唐存本,贡炳生,张贤明.山区天然河流设计最高通航水位确定方法的探讨[J].水运工程,2007(4):66-69.
TANG Cun-ben,GONG Bing-sheng,ZHANG Xian-ming.Onmethods for determining the desigh highest navigable stage of nat-ural rivers in mountain areas[J].Port&Waterway Engineering,2007(4):66-69.
[7]闵朝斌.关于最低通航设计水位计算方法的研究[J].水运工程,2002(1):29-33.
MING Chao-bin.An approach to the design lowest navigable waterlevel[J].Port Waterway Engineering,2002(1):29-33.