[1] 李文琪,贺立新.对宜宾小南门桥事故的思考[J].中国公路,2002(22):47-48.
Li Wenqi,He Lixin.Consideration the accidents Yibing Xiaonanmen Bridge[J].China Highway,2002(22):47-48.
[2] 姚翔.系杆拱桥吊杆疲劳的影响因素[J].公路,2007(12):38-44.
Yao Xiang.Influence factors on fatigue of hangers of tied arch bridges[J].Highway,2007(12):38-44.
[3] 黄东洲.钢管混凝土拱桥冲击系数的实用计算方法[C]//第十六届全国桥梁学术会议论文集.北京:人民交通出版社,2004.
Huang Dongzhou.Practical calculation method of concrete filled steel tubular arch bridge impact coefficient[C]//The 16thNational Bridge Academic Conference Proceedings.Beijing:China Communications Press,2004.
[4] 姚玲森.桥梁工程[M].2版.北京:人民交通出版社,2001.
Yao Lingsen.Bridge Engineering[M].2nded.Beijing:China Communications Press,2001.
[5] CECS 28—90钢管混凝土结构设计与施工规程[S].北京:中国计划出版社,1992.
CECS 28—90 Specification for Design and Construction of Concrete-Filled Tubular Structure[S].Beijing:China Planning Press,1992.
[6] 孙昊,钱永久,蔡迎春.结构参数变化对钢管混凝土拱桥动力特性的影响[J].重庆交通大学学报:自然科学版,2009,28(6):982-985,1074.
Sun Hao,Qian Yongjiu,Cai Yingchun.Influence of structural parameters variation on dynamic characteristics of concrete filled steel tubular arch bridge[J].Journal of Chongqing Jiaotong University:Natural Science,2009,28(6):982-985,1074.
[7] 李岩,陈彦江,黄新艺.大跨异形钢管混凝土拱桥车载冲击效应分析[J].哈尔滨工业大学学报,2010,42(1):109-114.
Li Yan,Chen Yanjiang,Huang Xinyi.Impact effect study on longspan irregular concrete filled steel tube arch bridge under moving vehicles[J].Journal of Harbin Institute of Technology,2010,42(1):109-114.
[8] 河南省交通规划勘察设计院.京珠高速公路黄河特大桥施工设计图[G].郑州:河南省交通规划勘察设计院,2001.
Henan Provincial Communications Planning Survey&Design Institute.Beijing—Zhuhai Expressway Yellow River Large Bridge Construction Design[G].Zhengzhou:Henan Provincial Communications Planning Survey&Design Institute,2001.
|