[1] 王连俊,朱孝笑,张光宗. 济南西客站站房基坑降水对京沪高铁路基沉降影响分析[J]. 工程地质学报,2012,20(3):459-465.
WANG Lianjun,ZHU Xiaoxiao,ZHANG Guangzong. Analysis of subgrade settlement of beijing-shanghai highspeed railway due to dewatering for foundation pit at jinan railway station [J]. Journal of Engineering Geology, 2012, 20(3): 459-465.
[2] 刘映晶,陈锦剑,王建华,等. 基坑逆作施工与上部运营铁路的相互影响分析[J]. 岩土工程学报,2010,32(增刊1):142-145.
LIU Yingjing,CHEN Jinjian,WANG Jianhua,et al. Interaction between the top-down subsurface excavation and upside running railway [J]. Chinese Journal of Geotechnical Engineering, 2010, 32(Sup1): 142-145.
[3] 郅友成. 既有铁路旁基坑开挖对高填方路堤稳定性的影响研究[J]. 公路交通科技,2006,23(3):31-34.
ZHI Youcheng. Analysis of the influence of excavation of foundation ditch besides railway on the stability of high-filling embankment [J]. Journal of Highway and Transportation Research and Development, 2006,23 (3): 31-34.
[4] 石钰锋,阳军生,白伟,等. 紧邻铁路偏压基坑围护结构变形与内力测试分析[J]. 岩石力学与工程学报,2011,30(4):826-833.
SHI Yufeng,YANG Junsheng,BAI Wei,et al. Analysis of field testing for deformation and internal force of unsymmetrical loaded foundation pits enclosure structure close to railway [J]. Chinese Journal of Rock Mechanics and Engineering, 2011, 30(4): 826-833.
[5] 李明广,陈锦剑,徐安军,等. 深基坑开挖与紧邻运营铁路的相互影响分析[J]. 地下空间与工程学报,2015,11(2):435-439.
LI Mingguang,CHEN Jinjian,XU Anjun,et al. Interactive behavior between the deep excavation and close operating railway [J]. Chinese Journal of Underground Space and Engineering, 2015, 11(2): 435-439.
[6] 李昂,王旭,蒋代军. 基于Verhulst动态新陈代谢的邻近铁路基坑变形预测[J]. 铁道科学与工程学报,2017,14(4):739-744.
LI Ang,WANG Xu, JIANG Daijun. Prediction of foundation pit deformation near by the railway based on verhulst dynamic metabolism [J]. Journal of Railway Science and Engineering, 2017,14 (4): 739-744.
[7] 郑明新,夏一鸣,袁钎,等. 深基坑开挖对邻近高速铁路桥墩桩基变形影响分析[J]. 施工技术,2017,46(5):12-15.
ZHENG Mingxin,XIA Yiming,YUAN Qian,et al. Deformation analysis of pile of bridge piers of high-speed railway affected by adjacent deep foundation excavation [J]. Constuction Technology, 2017, 46(5): 12-15.
[8] 王菲.大面积深基坑工程对高速铁路的影响性分析[J]. 铁道工程学报,2017,34(4):10-14.
WANG Fei. Analysis of the influence of large area deep foundation pit engineering on the adjacent high-speed railway[J]. Journal of Railway Engineering Society, 2017, 34(4): 10-14.
[9] 刘玉恒,黄峰. 基坑开挖对邻近铁道影响的数值模拟分析[J]. 施工技术,2014,43(1):83-86.
LIU Yuheng,HUANG Feng. Numerical simulation analysis on the effect of foundation excavation on adjacent railway [J]. Construction Technology, 2014, 43(1): 83-86.
[10] 胡谢飞. 深基坑开挖与临近既有城际铁路的相互影响研究[D]. 南京:南京大学,2013.
HU Xiefei. Research of Interaction between Deep Foundation Pit and Adjacent Existing Intercity Railway [D]. Nanjing: Nanjing University, 2013.
[11] 中铁第一勘察设计院. 铁路路基设计规范:TB 10001—2016[S]. 北京:中国铁道出版社,2017.
China Railway First Survey and Design Institute Group Co., Ltd. Code for Design of Railway Earth Structure: TB 10001—2016[S]. Beijing: China Railway Publishing House, 2017. |