[1] 中国工程建设标准化协会. 给水排水工程顶管技术规范:CECS 246:2008[S]. 北京:中国计划出版社,2008.
China Association for Engineering Construction Standardization.Technical Specification for Pipe Jacking of Water Supply and Sewerage Engineering: CECS 246:2008[S ]. Beijing: China Plan Press, 2008.
[2] 魏纲, 郑金涛. 顶管施工中顶力计算公式的探讨[J]. 市政技术, 2008, 26(5): 404-406, 409.
WEI Gang, ZHENG Jintao. Discussion on computing formula of jacking force in pipe jacking construction[J].Municipal Engineering Technology, 2008, 26(5): 404-406, 409.
[3] 刘华清, 付亚雄, 郑宏, 等. 顶管工程中顶进迎面阻力计算探讨[J]. 给水排水, 2016, 42(3): 106-111.
LIU Huaqing, FU Yaxiong, ZHENG Hong, et al. Study on the frontal resistance calculation of the pipe jacking [J]. Water & Wastewater Engineering, 2016, 42(3): 106-111.
[4] 向安田, 朱合华, 丁文其. 顶管施工中顶力和平均摩阻力与顶程关系分析[J]. 岩土力学, 2008, 29(4): 1005-1009.
XIANG Antian, ZHU Hehua, DING Wenqi. Relationship of jacking force and average friction with jacking path in pipe-jacking construction[J]. Rock and Soil Mechanics, 2008, 29(4): 1005-1009.
[5] 杨仙, 张可能, 黎永索, 等. 深埋顶管顶力理论计算与实测分析[J]. 岩土力学, 2013, 34(3): 757-761.
YANG Xian, ZHANG Keneng, LI Yongsuo, et al. Theoretical and experimental analyses of jacking force during deep-buried pipe jacking [J]. Rock and Soil Mechanics, 2013, 34(3): 757-761.
[6] 王双, 夏才初, 葛金科. 考虑泥浆套不同形态的顶管管壁摩阻力计算公式[J]. 岩土力学, 2014, 35(1): 159-166.
WANG Shuang, XIA Caichu, GE Jinke. Formulae of lateral friction resistance for pipe-jacking considering different forms of mud screen[J]. Rock and Soil Mechanics, 2014, 35(1): 159-166.
[7] 陈孝湘, 张培勇, 丁士君, 等. 大口径三维曲线顶管顶力估算及实测分析[J]. 岩土力学, 2015, 35(增刊1):547-552.
CHEN Xiaoxiang, ZHANG Peiyong, DING Shijun, et al. Jacking force estimating and measured data analysis of 3D curved long distance and large diameter pipe jacking[ J]. Rock and Soil Mechanics, 2015, 35(Sup 1): 547-552.
[8] 林国新. 长距离曲线顶管摩阻力实测分析及取值建议[J]. 给水排水, 2018, 44(5):100-103.
LIN Guoxin. In-situ measured data analysis and a suggestion for the selection of the resistance force value about long distance and curved pipe jacking[J]. Water & Wastewater Engineering, 2018, 44(5): 100-103.
[9] 罗景生. 泥水平衡顶管顶力突增过程实测及其应对措施分析[J]. 给水排水, 2018, 44(9):117-120.
LUO Jinsheng. In-situ measured data analysis and study on the law of jacking force increase suddenly in the mire water equilibrium pipe jacking [J]. Water & Wastewater Engineering, 2018, 44(9): 117-120. |