中文核心期刊
CSCD来源期刊
中国科技核心期刊
RCCSE中国核心学术期刊

Journal of Chongqing Jiaotong University(Natural Science) ›› 1999, Vol. 18 ›› Issue (3): 100-104.

Previous Articles     Next Articles

Measurement and Analysis for Drainage Effectiveness of Upward and Plumb Drainage Hole at Permanent Shiplockes in the Three-Gorge Project

XU Guang-xiang   

  1. Department of Ocean Engineering Chongqing Jiaotong Institute, Chongqing 400074, China
  • Received:1998-10-19 Online:1999-06-22 Published:2016-10-31

三峡永久船闸排水洞中仰铅排水孔排水效果量测分析

许光祥   

  1. 重庆交通学院河海建筑工程系, 重庆 400074
  • 作者简介:许光祥(1966-),男,重庆潼南人,重庆交通学院副教授,从事岩土工程及水利工程研究.

Abstract: Drainae discharge of upward and plumb drainage hole at Permanent Shiplockes in the Three-Gorge Project was measured in situ.Result shows that drainage effectiveness of upward hole has an obvious advantage over that of plumb hole.We have analyzed discontinuities in drainage gallery and numbers that drainasge hole pass through discontinuities in terms of theory.Theroretical result is the same as the measured result in situ.

Key words: upward drainage hole, plumb drainage hole, discontinuity, drainage effectiveness

摘要: 笔者对三峡工程永久船闸排水洞中的仰、铅两种布设方式的排水孔进行了排水量实地观测.结果表明,仰孔的排水效果明显优于铅孔.再对排水洞的结构面及排水孔穿过结构面的数目分析,其理论分析结果与实测基本一致.

关键词: 仰孔, 铅孔, 结构面, 排水效果

CLC Number: