[1] |
ZHANG Min1, XU Nuo1, ZHOU Linqi1, HAN Yu1,2.
Influence of Inserting Steel Plates on the Cable Force and
Alignment of Main Arch
[J]. Journal of Chongqing Jiaotong University(Natural Science), 2020, 39(06): 53-58.
|
[2] |
LIU Jiakui1, LUO Hao1, DU Bin2.
Adjusting Method for Anchor-Span Cable Force of Steel Truss
Suspension Bridge in the Cabling Phase
[J]. Journal of Chongqing Jiaotong University(Natural Science), 2020, 39(02): 50-54.
|
[3] |
XU Hanzheng, CAI Changwei, LI Haoshi.
Comparative Analysis on Calculation Method of Tied Archs
Suspension Rod
[J]. Journal of Chongqing Jiaotong University(Natural Science), 2019, 38(04): 23-28.
|
[4] |
ZHOU Yin, ZHANG Xuesong, DING Yanchao.
Application of Stress-Free State Method in Long-Span
Arch Bridge Construction
[J]. Journal of Chongqing Jiaotong University(Natural Science), 2018, 37(08): 6-10.
|
[5] |
LIU Dayang, HE Xiaoqin.
Cable Force Measurement of Steel Strand of Stay Cable with HDPE Shell
[J]. Journal of Chongqing Jiaotong University(Natural Science), 2017, 36(9): 12-16.
|
[6] |
ZHOU Yungang.
Optimization Method of Cable Force for LargeSpan MultiTowerer CableStayed Bridges under Dead Load
[J]. Journal of Chongqing Jiaotong University(Natural Science), 2017, 36(2): 1-6.
|
[7] |
Zou Li, Peng Xumin, Wei Dongsheng.
Accurate Calculation Method of Equal Tensile Force of Parallel Strand Stayed-Cable
[J]. Journal of Chongqing Jiaotong University(Natural Science), 2015, 34(2): 7-9.
|
[8] |
Liu Yiming , Liu Dayang , Liu Shanhong.
Optimization of Cable Forces of Cable-Stayed Bridges Based on
MATLAB and ANSYS Software under Dead Loads
[J]. Journal of Chongqing Jiaotong University(Natural Science), 2013, 32(6): 1111-1114.
|
[9] |
Liu Yiming , Liu Dayang , Liu Shanhong.
Optimization of Cable Forces of Cable-Stayed Bridges Based on
MATLAB and ANSYS Software under Dead Loads
[J]. Journal of Chongqing Jiaotong University(Natural Science), 2013, 32(6): 1111-1114.
|
[10] |
XIAO Jun,ZHANG Yong-shui,DONG Yi.
Suspension Anchor Span Strand Analysis and Program Implementation
[J]. Journal of Chongqing Jiaotong University(Natural Science), 2011, 30(5): 907-910.
|
[11] |
GONG Cheng-li, LIU Jing.
Calculation?of?Cable?Forces?of?CFST?Arch?Bridge?during?Core?Concrete?Casting
[J]. Journal of Chongqing Jiaotong University(Natural Science), 2009, 28(5): 830-832.
|
[12] |
DENG Jiang-ming.
Geometrical?Analysis?of?Arch?Rib?Elevation?Change?Caused??by?Tower?Deviation?during?Cable-Hoisting?Construction
[J]. Journal of Chongqing Jiaotong University(Natural Science), 2009, 28(3): 505-507.
|
[13] |
MEI Gai-wei, ZHANG Min, ZHOU Shui-xing.
Solution on Cable Force and Segmental Camber in Arch Bridge Construction by Modified Inverted Method
[J]. Journal of Chongqing Jiaotong University(Natural Science), 2009, 28(2): 199-202.
|
[14] |
LI Yi, YAN Dong-huang, LI Xue-wen.
Research on the Reasonable Finished Dead State of Concrete Cable-Stayed Bridges
[J]. Journal of Chongqing Jiaotong University(Natural Science), 2008, 27(6): 1017-1019,1023.
|
[15] |
WANG Wei-sheng,ZHAO Rong-gao,LI Feng-hui.
Determination of Cable Forces in Completion State with ANSYS
[J]. Journal of Chongqing Jiaotong University(Natural Science), 2007, 26(5): 17-20.
|