中文核心期刊
CSCD来源期刊
中国科技核心期刊
RCCSE中国核心学术期刊

Journal of Chongqing Jiaotong University(Natural Science) ›› 2002, Vol. 21 ›› Issue (2): 90-93.

Previous Articles     Next Articles

Research on mechanism for fissures to cause in concrete tunnel box

CHEN Hong-kai,WANG Kai,YUAN Jian-yi,WANG Rong   

  1. Institute of Geotechnical Engineering , Chongqing Jiaotong University , Chongqing 400074, China
  • Received:2001-05-08 Revised:2001-06-11 Online:2002-06-15 Published:2015-05-18

沙滨路沟埋式砼箱涵裂缝发育过程研究

陈洪凯,王凯,袁建议,王蓉   

  1. 重庆交通学院岩土工程研究所,重庆400074
  • 作者简介:陈洪凯(1964—),男,重庆市江津人,教授、博士,长期从事岩土、结构与材料相互作用研究工作
  • 基金资助:
    重庆世行基金项目成果(20002)、(20011)、(20012)之一

Abstract: On the basis of testing in-situ to fissures occurring in buried reinforced concrete box-culvert at Shabin road, Chongqing, the authors divide fissures locating at inter box -culvert into longitudinal fissure and section fissure in the paper , and approach development trend .All results show that fissures at present have made stable before rain season . More research on stability of the box-culvert in rain season, structure safety and harness are done and discussed

Key words: buried box-culvert , fissures , development

摘要: 基于对重庆沙滨路沟埋式砼箱涵裂缝的连续现场测试结果,其箱涵内部的裂缝分为纵向裂缝和横向裂缝, 并对箱涵顶板、底板及侧壁的纵向裂缝和横向裂缝进行趋势分析。结果表明,在雨季之前,裂缝发育已经趋于稳 定。并就裂缝的雨季稳定、结构安全性及裂缝治理等问题进行了分析

关键词: 沟埋式砼箱涵, 裂缝, 发育过程

CLC Number: