Some technical problems in the supervision of long span RC arch bridge construction with scaffold

LUO Hong, XU Jun-lan, ZHANG Yong-shui   

  1. School of Civil Engineering & Architecture, Chongqing Jiaotong University, Chongqing 400074, China
  • Received:2003-12-26 Revised:2004-02-06 Online:2004-10-15 Published:2015-05-18

大跨RC拱桥有支架施工中的几个技术问题

罗红,徐君兰,张永水   

  1. 重庆交通学院土木建筑学院重庆400074
  • 作者简介:罗红(1973—),女,四川省攀枝花市人,硕士生,从事大跨径桥梁施工控制研究

Abstract: The key technical problems in construction of long span reinforced concrete arch bridge with scaffold include: layer’s height of main arch, time of pouring concrete , subsection’s length of main arch, procedures of pouring and decentering of main arch etc. This paper provides some references for constructing bridges of this type by a case study of Xugou Bridge.

Key words: reinforced concrete arch bridge, main arch, decentering of scaffold

摘要: 采用支架施工的大跨钢筋砼(RC)拱桥施工中的关键技术问题主要包括主拱圈高度与浇筑的时间确定、主拱 圈分段长度与浇筑程序的确定、主拱圈落架方案的拟定。通过介绍许沟大桥在上述三个方面的工程实践与应用,为 该类桥梁的建设提供借鉴与参考。

关键词: 钢筋砼拱桥, 主拱圈, 支架卸落

CLC Number: