Briefly discussed the risk of the build-transfer project in construction

SHEN Qi-ming   

  1. School of Management, Chongqing Jiaotong University, Chongqing 400074, China
  • Received:2004-11-08 Online:2005-12-15 Published:2016-11-09

略论“建设-转让(BT)”项目建设中的风险

沈其明   

  1. 重庆交通学院管理学院, 重庆 400074
  • 作者简介:沈其明(1948-),男,重庆市人,教授,国家注册造价工程师、监理工程师、投资咨询工程师,主要从事项目管理的教学和研究工作

Abstract: This paper analyzed the present condition and feature of the Build-Transfer Project (abbreviation BT Project),discussed the risk of the BT project Proprietor, Investor, Contractor and supervisory Engineer in BT project construction.

Key words: build-transfer project (abbreviation BT Project), construction, risk

摘要: 本文分析了我国"建设转让"项目(即BT项目)建设的现状及特征,详细论述了BT项目业主、投资商、承包商、监理在BT项目建设中的风险.

关键词: 建设-转让(BT)项目, 建设, 风险