Abstract: The site monitoring was made during the exit construction of Dongmengnan highway tunne1.By means of the monitoring and detailed analysis for eaeh construction stage,feedback controlling desin is realized and the NATM construetion is controlled.
Key words: Dongmenguan highway tunnel, new austrian tunnelling methed(NATM), construction monitoring
摘要: 笔者详细介绍了东门关公路隧道出口软弱围岩段新奥法施工的现场监控量测工作.通过对各施工阶段的监 测与分析,配合和指导其施工实践.
关键词: 东门关公路隧道, 新奥法, 监控量测
CLC Number:
U452.1+3
XU Lin-sheng. Monitoring during the exit NATM constretion of dongmenguan tunnel[J]. Journal of Chongqing Jiaotong University(Natural Science), 2006, 25(1): 24-26.
徐林生. 东门关隧道出口新奥法施工监控量测研究[J]. 重庆交通大学学报(自然科学版), 2006, 25(1): 24-26.