Suspending placement and the methods of wind-resistance of Hulukou Jinshajiang bridge

ZHU Liang-qing1,XU Yong,2,3 ZHOU Zhi-xiang2   

  1. 1.Panzbihua Trafic Bureu,Panzhihua 617000,China;2.Chongjing Jiaotong University,Chongqing400074, Clfina;3.Southwest Jiaotong University,Chercdu 610031,China
  • Received:2005-10-12 Revised:2005-11-23 Online:2006-12-15 Published:2015-05-18

葫芦口金沙江大桥的吊装施工与抗风措施

朱良清1,徐勇2,3,周志祥2   

  1. 1.攀枝花市交通局,四川 攀枝花 617000;2.重庆交通大学,重庆 400074; 3.西南交通大学,四川 成都 610031
  • 作者简介:朱良清(1967—),男,四川雅安人,高级工程师,主要从事桥梁专业方面的研究和管理工作.

Abstract: In the paper,the construction technology of suspending placement and closure approaching of Itulukou Jiushajimlg Bridge is intm— duced.And also the methods of wind—resistance are introduced Mille constructing the bridge which is located in strong mons00n area.The pa— per earl supply references to construction of long span arch bridges in similar condition.

Key words: arch bridge, technology of suspending placement, methods of wind—resistance

摘要: 介绍了葫芦1:3金沙江大桥的缆索吊装施工工艺和合龙过程,另外还介绍了施工中采取的抗风措施(该桥处于 季风强劲区域),可为在类似条件下建设大跨度拱桥借鉴.

关键词: 拱桥, 吊装工艺, 抗风措施