中文核心期刊
CSCD来源期刊
中国科技核心期刊
RCCSE中国核心学术期刊

Journal of Chongqing Jiaotong University(Natural Science) ›› 2006, Vol. 25 ›› Issue (增刊1): 24-27.

Previous Articles     Next Articles

Design and Installation of Hanging Basket of Fuling Wujiang Second Bridge

WANG Hao1,XIAO Guang-hong 1,ZHANG Qiu-ling2   

  1. 1.School of Civil Engineering & Architecture,Chongqing Jiaotong University,Chongqing 400074,China; 2.School of River & Ocean Eneering,Chongqing Jiaotong University,Chongqing 400074,China
  • Received:2006-06-09 Revised:2015-05-18 Online:2006-07-15 Published:2015-05-18

涪陵乌江二桥挂篮的设计与安装

王浩1,肖光宏1,张秋陵2   

  1. 1.重庆交通大学土木建筑学院,重庆 400074;2.重庆交通大学河海学院,重庆 400074
  • 作者简介:王浩(198—),男,湖北人,硕士生,从事桥梁结构方面研究.

Abstract: The design of the separate and post-fulcrum hanging basket of Fuling Wujiang second bridge is described.The installation order of the hanging basket's components according to the actual condition of construction field is in trod uced,Introduced and several problems in the installation are talded about.

Key words: hanging basket, installation, steel box girder, cable-stayed bridge

摘要: 介绍了涪陵乌江二桥分离式后支点挂篮的设计.结合施工现场的实际情况介绍了该挂篮构件的安装顺序,提出了安装过程中遇到的几个问题.

关键词: 挂篮, 安装, 钢箱梁, 斜拉桥

CLC Number: