| [1] |
LIU Junde1, DENG Zhengyang2, ZHU Shifeng3, ZHAO Wenhao4, LI Chengjun5, FAN Liang2.
Progressive Damage Test on Hangers of an Existing Decommissioned Concrete-Filled Steel Tubular Arch Bridge
[J]. Journal of Chongqing Jiaotong University(Natural Science), 2026, 45(4): 1-8.
|
| [2] |
XU Lueqin1,2, ZHANG Ling1, GONG Hao1.
Near-Fault Seismic Response of Large-Span CFST Tied Arch Bridge
Considering Soil-Pile Interaction
[J]. Journal of Chongqing Jiaotong University(Natural Science), 2021, 40(10): 63-72.
|
| [3] |
PAN Binghong1,2, NI Xu1, TANG Lijiao1, ZHAO Yaru1, YU Yingjie1.
Reserach on the Operating Speed Transition Section Length
at Ring off-ramp of B-type Trumpet Interchange
[J]. Journal of Chongqing Jiaotong University(Natural Science), 2019, 38(03): 32-37.
|
| [4] |
CHEN Zaiqian, PU Shutao, GUO Guo, SHUAI Shijie.
Numerical Simulation on the Bending Properties of Micro CFST Members
[J]. Journal of Chongqing Jiaotong University(Natural Science), 2018, 37(1): 72-79.
|
| [5] |
ZHANG Huiling, YANG Linyu, AO Guchang.
Review of Delay Parameter Acquisition at the Signalized Intersection
[J]. Journal of Chongqing Jiaotong University(Natural Science), 2017, 36(3): 90-97.
|
| [6] |
HAO Niebing, GU Anbang.
Alignment Adjustment Method of Concrete Filled Steel Tubular Arch Bridge in Arch Rib Hoisting
[J]. Journal of Chongqing Jiaotong University(Natural Science), 2016, 35(3): 1-5.
|
| [7] |
Zeng Yong, Tan Hongmei.
Dynamic Characteristics of CFST Arch Bridge in Construction Stage by Tower-Cable-Arch Integration Modeling
[J]. Journal of Chongqing Jiaotong University(Natural Science), 2014, 33(5): 17-22.
|
| [8] |
Jiang Wei,Lv Dagang.
Time-Dependent Reliability Analysis on In-Plane Stability of
Concrete-Filled Steel Tubular Arches
[J]. Journal of Chongqing Jiaotong University(Natural Science), 2013, 32(增1): 769-771.
|
| [9] |
Zhou Shuixing,Li Wei.
Causes of Common Diseases of CFST Arch Bridge
[J]. Journal of Chongqing Jiaotong University(Natural Science), 2013, 32(增1): 738-741.
|
| [10] |
Han Xi,Xiang Li,Zhong Li,Yang Jin,Chen Hui.
Application of Hilbert-Huang Transform in CFST Void Detection Based on Acoustic Vibration Signal
[J]. Journal of Chongqing Jiaotong University(Natural Science), 2013, 32(1): 14-17.
|
| [11] |
XING Fan, ZHU Bing.
Seismic Action Assessment Indicator of Nearfault Ground Motion for Longspan CFST Arch Bridge
[J]. Journal of Chongqing Jiaotong University(Natural Science), 2011, 30(2): 190-195.
|
| [12] |
SHEN Pei-wen,DING Yong-can,ZHOU Shui-xing,CHEN Yue.
Safety Evaluation Method and System Exploitation of CFST Arch Bridge
[J]. Journal of Chongqing Jiaotong University(Natural Science), 2011, 30(1): 22-26.
|
| [13] |
SUN Dong-sheng,ZHU Yi,ZHOU Shui-xing.
Application of Exponential Scale of AHP in Bridge Evaluation
[J]. Journal of Chongqing Jiaotong University(Natural Science), 2010, 29(6): 867-870.
|
| [14] |
TONG Jian-sheng,ZHOU Shui-xing,SUN Ce-shi.
Analysis on Pouring Sequence of CFST Arch Bridge with Six Tubes
[J]. Journal of Chongqing Jiaotong University(Natural Science), 2010, 29(3): 348-451.
|
| [15] |
SHEN Pei-wen,ZHOU Shui-xing,LUO Fei.
Stability Analysis on Large-Span CFST Arch Bridge at Construction Stage
[J]. Journal of Chongqing Jiaotong University(Natural Science), 2010, 29(3): 340-343.
|