Mechanism and Precautionary Measures for Cracking of Pre-Stressed Concrete
Continuous Box Girder of Continuous and Rigid Frame Bridges in Service Phase
CHEN Yu-feng,LUO Ling,WANG Wei-hong,WANG Yun-tao,XU Jun-Lan
2007, 26(6):
43-45.
Based on the cracking investigation,some inclined cracks in webs apprearing in the continuous prestressed concrete box girder bridge in service phase are analyzed.Main factors inducing cracks are considered.such as temperature gradient,vehicular load,principal tensile stress of concrete,fatigue under temperature load and vehicular load.Proper temperature gradient should be selected in design phase to avoid crack.Some anti-rust coatings Can be daubed on the surface of the steel strands to protect them from corrosion by cavity seepage.Webs of box girder from one quarter to three quarters of each span may be poured with steel fiber reinforced concrete to avoid fatigue effect.
References |
Related Articles |
Metrics
|