[1]周孟波.悬索桥手册[M].北京:人民交通出版社,2003.
[2]罗喜恒,林长川.悬索桥锚跨索股分析[C]//江阴长江公路大桥工程建设论文集.北京:人民交通出版社,2002.
[3]牛和恩.虎门大桥工程:第2册[M].北京:人民交通出版社,1998.
[4]沈锐利,薛光雄.悬索桥主缆丝股锚固力的计算方法探讨[J].桥梁建设,2003(6):25-29.
SHEN Rui-li,XUE Guang-xiong.Study of calculation methods foranchorage force of main cable wire strands of suspension bridge[J].Bridge Construction,2003(6):25-29.
[5]罗喜恒,肖汝诚,项海帆.悬索桥锚跨索股分析研究[J].公路交通科技,2004,21(12):45-53.
LUO Xi-heng,XIAO Ru-cheng,XIANG Hai-fan.Analysis study ofanchor span strand for suspension bridge[J].Journd of Highway andTransportation Research and Development,2004,21(12):45-53.
[6]唐茂林,沈锐利,强士中.大跨度悬索桥丝股架设线形计算的精确方法[J].西南交通大学学报,2001,36(3):303-307.
TANG Mao-lin,SHEN Rui-li,QIANG Shi-zhong.An accuratecalculation method for ercting curves of wier strands of longsuspention bridges[J].Journal of Southweast Jiaotong Univesity,2001,36(3):303-307.
[7]林恰,崔冰,唐茂林,等.边跨主缆角度对悬索桥的影响分析[J].重庆交通大学学报:自然科学版,2010,29(3):336-339.
LIN Qia,CUI Bing,TANG Mao-Lin,et al.Influence analysis onmain cable angle of side span of suspension bridge[J].Journal ofChongqing Jiaotong University:Natural Science,2010,29(3):336-339.
[8][日]小西一郎.钢桥[M].朱立冬,译.北京:人民铁道出版社,1984.
[9]张克,段玉凤.悬索桥主缆索股在散索过程中的稳定[C]//江阴长江公路大桥工程建设论文集.北京:人民交通出版社,2002.
[10]谭浩强,田淑清.Fortran语言——Fortran77结构化程序设计[M].北京:清华大学出版社,1998.
|