XIANG Nan,YU Jia-yu. Test and Analysis of Temperature Effect of Prestressed Concrete Box Girder[J]. Journal of Chongqing Jiaotong University(Natural Science), 2011, 30(S2): 1261-1264.
[1]王国亮,郑晓华.大跨径预应力混凝土箱梁桥长期下挠问题的研究现状[J].公路交通科技,2007,1(1):47-50.
WANG Guo-liang,ZHENG Xiao-hua.State of art of long-term de-flection for long span prestressed concrete box-girder bridge[J].Journal of Highway and Transportation Research and Development,2007,1(1):47-50.
[2]盛洪飞.混凝土箱形截面桥梁日照温度应力简化计算[J].哈尔滨建筑工程学院学报,1992,25(1):32-39.
SHENG Hong-fei.Simplified calculation of sunsline temperature stess of concrete box-section bridge[J].Journal of Harbin Institure of Architectural Engineering,1992,25(1):32-39.
[3]余佳玉.重复温度荷载对预应力混凝土箱梁的影响研究[D].重庆:重庆交通大学,2011.
[4]范立础.预应力混凝土连续梁桥[M].北京.人民交通出版社,1988.
[5]王效通.预应力混凝土箱梁温度场计算的有限元法[J].西南交通大学学报,1985(3):52-62.
WANG Xiao-tong.Temperature filed calculation of presturessed concrete box gider by finite ekement method[J].Journal of South-west Jiaotong University,1985(3):52-62.