Niu Denghui , Zhou Zhixiang , Wu Haijun , Wang Shaomi. Control Method of Stress-Free Status in Transition Process of Structural
System for Self-Anchored Suspension Bridge[J]. Journal of Chongqing Jiaotong University(Natural Science), 2014, 33(1): 21-24.
[1] 李小年. 自锚式悬索桥合理成桥状态确定及吊索张拉优化研究 [D]..长沙:中南大学,2009:60-61.
Li Xiaonian. Analysis of Target Completion Status and Hanger Tensioning on Self-anchored Suspension Bridge [D]. Changsha Central South University, 2009: 60-61.
[2] 纪世奎. 自锚式悬索桥合理施工状态分析 [D]..哈尔滨:东北林业大学,2010:53-55
Ji Shikui. Analysis of Reasonable Construction State for Self-Anchored Suspension Bridge [D]. Harbin: Northeast Forestry University, 2010: 53-55
[3] 中铁大桥勘测设计院有限公司.分阶段施工桥梁的无应力状态控制法与工程实践[R].武汉,2007.
China Zhongtie Major Bridge Reconnaissance & Design Institute Co., Ltd. Unstressed State Control Method and Engineering Practice for Bridges Constructed in Stages [R]. Wuhan, 2007.
[4] 秦顺全.分阶段施工桥梁的无应力状态法控制法[J].桥梁建设,2008(1):8-14.
Qin Shunquan. Unstressed state control method for bridges constructed in stages [J]. Bridge Construction, 2008 (1): 8-14.
[5] 秦顺全.桥梁施工控制—无应力状态法理论与实践[M].北京:人民交通出版社,2006
Qin Shunquan. Bridge Construction Control-Unstressed State Theory and Practice [M]. Beijing: China Communications Press, 2006.
[6] 秦顺全.斜拉桥安装无应力状态控制法[J].桥梁建设,2003(2):31-34.
Qin Shunquan. Application of unstressed state control method to calculation for erection of cable-stayed bridge [J]. Bridge Construction. 2003 (2): 31-34.
[7] 沈锐利. 悬索桥主缆系统设计及架设计算方法研究[J]. 土木工程学报,1996,29(2):2-9. Shen Ruili. Calculation methods for design and erection of cable curve of suspension bridge [J]. China Civil Engineering Journal, 1996, 29(2).
[8] 唐茂林. 大跨度悬索桥空间几何非线性分析与软件开发[D]. 成都:西南交通大学,2003.
Tang Maolin. Long-Span Suspension Bridge and Software Development [D]. Chengdu: Southwest Jiaotong University, 2003.