[1] 姜秀荣.高速公路交通事件应急救援系统及关键技术研究[D].长春:吉林大学,2014:2-3.
JIANG Xiurong.Study on Expressway Traffic Incident Emergency Rescue System and Key Technologies[D]. Changchun: Jilin University,
2014: 2-3.
[2] WEX F, SCHRYEN G, FEUERRIEGEL S, et al. Emergency response in natural disaster management: allocation and scheduling of rescue
units[J]. European Journal of Operational Research, 2014, 235(3): 697-708.
[3] SUNG I, LEE T. Optimal allocation of emergency medical resources in a mass casualty incident: patient prioritization by column
generation[J]. European Journal of Operational Research, 2016, 252(2): 623-634.
[4] LIU C, ZENG Q,DUA H,et al. E-net modeling and analysis of emergency response processes constrained by resources and uncertain
durations[J]. IEEE Transactions on Systems, Man, and Cybernetics: Systems, 2015, 45(1): 84-96.
[5] 石志刚,杨秀军.高速公路救援资源的两阶段协作优化配置研究[C]//第三十一届中国控制会议论文集, 2012:7261-7264.
SHI Zhigang, YANG Xiujun. On optimal allocation of highway rescue resources based on two-stage collaboration[C]//Proceedings of the
31st Chinese Control Conference, 2012:7261-7264.
[6] 黄德启.面向区域路网的应急资源布局与调度方法研究[D]. 武汉:武汉理工大学,2012:12-13.
HUANG Deqi. Research on Emergency Resources Layout and Scheduling Method for the Regional Road Network[D]. Wuhan: Wuhan University,
2012:12-13.
[7] 柴干,赵倩,黄琪,等.高速公路交通应急救援资源的配置[J]. 中国安全科学学报,2010,20(1):165-170.
CHAI Gan, ZHAO Qian, HUANG Qi, et al. Allocation of emergency rescue resources for freeway traffic[J]. China Safety Science Journal,
2010, 20(1):165-170.
[8] 王旭坪, 马超, 阮俊虎. 运力受限的应急物资动态调度模型及算法[J]. 系统工程理论与实践, 2013, 33(6): 1492-1500.
WANG Xuping, MA Chao, RUAN Junhu. Model and algorithm of relief materials dynamic scheduling without sufficient vehicle quantity[ J].
Systems Engineering—Theory & Practice, 2013, 33(6): 1492-1500.
[9] DIXON K K, Humme J E,LORSCHEIDER A R. Capacity for North Carolina freeway work zones[J]. Transportation Research Record,
1995, 1529: 27-34.
[10] 中华人民共和国交通部.公路工程技术标准: JTG B01—2003 [S].北京:人民交通出版社,2004.
Ministry of Communications of the Peoples Republic of China. Technical Standard of Highway Engineering: JTG B01—2003 [S].
Beijing: China Communications Press, 2004.
[11] 亓会杰.高速公路改扩建期间施工路段通行能力研究[D].西安:长安大学,2009: 30.
QI Huijie. Study on the Traffic Capacity of the Construction Section during Expressway Reconstruction[D]. Xian: Changan
University, 2009: 30.
[12] 刘玲.企业参与自然灾害应急管理的相关问题研究[D].秦皇岛:燕山大学,2009:5-6.
LIU Ling.The Research on Enterprise Participating in Natural Disaster Emergency Management Related Issues[D]. Qinhuangdao: Yanshan
University, 2009: 5-6.
[13] 时洪然.突发事件下基于道路可恢复性的灾点物资调度[D].济南:山东大学,2010:20-21.
SHI Hongran. Emergency Materials Dispatch Based on Road Restorability[D]. Jinan: Shandong University, 2010: 20-21.
[14] 刘春林,何建敏,施建军.一类应急物资调度的优化模型研究[J].中国管理科学,2001,9(3):29-36.
LIU Chunlin, HE Jianmin, SHI Jianjun. The study on optimal model for a kind of emergency material dispatch problem[J]. Chinese
Journal of Management Science, 2001, 9(3): 29-36.
[15] 刘春林,施建军,李春雨.模糊应急系统组合优化方案选择问题的研究[J].管理工程学报,2002,16(2):25-28.
LIU Chunlin, SHI Jianjun, LI Chunyu. Selection of the combinatorial optimal scheme for fuzzy emergency system[J]. Journal of
Industrial Engineering and Engineering Management, 2002, 16(2):25-28.
[16] 汤兆平,耿彪,刘卫卫,等.铁路突发事件应急资源调配的优化与决策[J].科学技术与工程,2017,17(4):292-297.
TANG Zhaoping, GENG Biao, LIU Weiwei, et al. Optimization and decision-making of emergency resource dispatch in railway incidents [J]
. Science Technology and Engineering, 2017, 17(4): 292-297.
[17] 戴更新,达庆利.多资源组合应急调度问题的研究[J].系统工程理论与实践,2000(9):52-55.
DAI Gengxin, DA Qingli. The study of combinatorial scheduling problem in emergency systems[J]. Systems Engineering-Theory &
Practice, 2000(9): 52-55.
[18] 牛宏睿,李平,王富章.铁路突发事件多应急点资源调度模型及仿真研究[J].铁路计算机应用,2009,18(12):20-22.
NIU Hongrui, LI Ping, WANG Fuzhang. Research on modeling and simulation of multi-emergency-areas model for emergency resource dispatch
in railway emergency events[J]. Railway Computer Application, 2009, 18(12): 20-22. |