中文核心期刊
CSCD来源期刊
中国科技核心期刊
RCCSE中国核心学术期刊

Journal of Chongqing Jiaotong University(Natural Science) ›› 2009, Vol. 28 ›› Issue (5): 830-832.DOI: 10.3969/j.issn.1674-0696.2009.05.05

Previous Articles     Next Articles

Calculation?of?Cable?Forces?of?CFST?Arch?Bridge?during?Core?Concrete?Casting

GONG Cheng-li1, LIU Jing2   

  1. 1.?Highway?Technology?&?Management?Station?of?Wushan?County,?Chongqing?Wushan?404700,?China?;??2.?Communication?Survey?&?Design?Station?of?Wushan?County,?Chongqing?Wushan?404700,?China
  • Received:2009-05-15 Revised:2009-06-28 Online:2009-10-15 Published:2015-04-15

钢管混凝土拱桥管内混凝土灌注阶段扣索力计算

龚成立1,刘??静2   

  1. 1.重庆市巫山县公路技术管理所,重庆404700;2.重庆市巫山县交通勘察设计室,重庆404700
  • 作者简介:龚成立(1968—),男,重庆巫山人,工程师,主要从事桥梁工程管理工作。E-mail:wsgc@ltom.com。
  • 基金资助:
    西部交通科技项目( 2006 3188 1422)

Abstract: During?the?concrete?casting?process?of?concrete?filled?steel?tubular?(CFST)?arch?bridge,?the?phenomenon?that?the?process?tension?stress?could?exceed?allowable?stress?will?occur?at?some?stages,?and?the?process?tension?stress?must?be?adjusted?by?cable?forces.?To?find?the?best?cable?position,?a?method?making?use?of?the?sectional?stress?influence?line?of?core?concrete?at?arch?footing?is?put?forward.?The?stresses?of?control?section?about?core?concrete?casting?and?unit?cable?force?are?calculated?respectively.?According?to?allowable?stress?value?of?concrete?at?casting?stage,?the?value?of?cable?forces?during?the?core?concrete?casting?is?figured?out.?A?case?study?is?carried?out?at?Xiaohe?CFST?arch?bridge?under?construction?in?Hubei?Enshi,?and?the?calculation?method?is?introduced?in?detail.

Key words: concrete filled steel tubular (CFST) arch bridge , concrete casting , stress influence line , cable force , process tension stress ;

摘要: 钢管混凝土拱桥管内混凝土灌注时,会在某些阶段产生超过混凝土容许值的过程拉应力,需要通过张拉扣索 力来调整。提出利用拱脚管内混凝土截面应力影响线来寻找最佳扣索点位置,分别计算管内混凝土灌注阶段和单 位扣索力下控制截面的应力。根据混凝土施工过程中的容许应力值,计算出混凝土灌注时所需的扣索张拉值。结 合在建中的湖北恩施小河特大桥,介绍详细计算方法

关键词: 钢管混凝土拱桥, 混凝土灌注, 应力影响线, 扣索索力, 过程拉应力

CLC Number: