中文核心期刊
CSCD来源期刊
中国科技核心期刊
RCCSE中国核心学术期刊

Journal of Chongqing Jiaotong University(Natural Science) ›› 2006, Vol. 25 ›› Issue (1): 24-26.

Previous Articles     Next Articles

Monitoring during the exit NATM constretion of dongmenguan tunnel

XU Lin-sheng   

  1. School of Civil Engineering & Architecture,Chongqing Jiaotong University,Chongqing 400074,China
  • Received:2004-12-27 Revised:2005-03-15 Online:2006-02-15 Published:2015-05-18

东门关隧道出口新奥法施工监控量测研究

徐林生   

  1. 重庆交通学院土木建筑学院,重庆 400074
  • 作者简介:徐林生(1964—),男,浙江桐乡市人,博士后,教授,主要从事岩土力学与隧道工程的教学 、科研工作.

Abstract: The site monitoring was made during the exit construction of Dongmengnan highway tunne1.By means of the monitoring and detailed analysis for eaeh construction stage,feedback controlling desin is realized and the NATM construetion is controlled.

Key words: Dongmenguan highway tunnel, new austrian tunnelling methed(NATM), construction monitoring

摘要: 笔者详细介绍了东门关公路隧道出口软弱围岩段新奥法施工的现场监控量测工作.通过对各施工阶段的监 测与分析,配合和指导其施工实践.

关键词: 东门关公路隧道, 新奥法, 监控量测

CLC Number: