[1] WANG Y, ZHANG W, CHEN W. Study of the WBS criteria for rail transit risk assessment[J]. Modern Tunnelling Technology, 2013, 50(3): 40-45.
[2] 谷昀. 基于模糊综合评判法的地铁施工风险评估研究[D].北京:中国铁道科学研究院,2013.
GU Yun. Research on Risk Assessment of Metro Construction Based on Fuzzy Comprehensive Evaluation Method[D]. Beijing: China Academy of Railway Sciences,2013.
[3] 张富贵, 谌微微, 赵晓波. 我国轨道交通研究热点的可视化分析[J]. 重庆交通大学学报(自然科学版), 2018, 37(9):113-121.
ZHANG Fugui, CHEN Weiwei, ZHAO Xiaobo. Visualization analysis for research hotspots of rail transit in China[J].Journal of Chongqing Jiaotong University (Natural Science), 2018, 37(9): 113-121.
[4] 杨永平,边颜东,周晓勤,等.我国城市轨道交通存在的主要问题及发展对策[J].城市轨道交通研究,2013,16(10):1-6.
YANG Yongping, BIAN Yandong, ZHOU Xiaoqin, et al. Problems and development strategy of urban rail transit in China[J]. Urban Mass Transit, 2013,16(10):1-6.
[5] HYUN H C, SANKARAN M. Construction project risk assessment using existing database and project-specific information[J]. Journal of Construction Engineering and Management, 2008, 134(11): 894-903.
[6] HYU S S, YOUNG C K, YONG S J, et al. Methodology for quantitative hazard assessment for tunnel collapses based on case histories in Korea[J]. International Journal of Rock Mechanics and Mining Sciences, 2009, 46 (6): 1072-1087.
[7] JURADO A, GASPARI F D, VILARRASA V, et al. Probabilistic analysis of groundwater-related risks at subsurface excavation sites[J]. Engineering Geology, 2012, 125(1): 35-44.
[8] 沈尉. 城市轨道交通枢纽站超深基坑的施工风险控制[J]. 上海交通大学学报, 2012, 46(7): 1168-1172.
[9] SHEN Wei. Risk controlling technology of super deep excavation in urban metro construction[J]. Journal of Shanghai Jiaotong University, 2012, 46(7): 1168- 1172.
[9] 庄晶晶. 基于FMECA技术的城市轨道交通项目施工风险评价研究[D]. 石家庄: 石家庄铁道大学,2013.
ZHUANG Jingjing.Research on Risk Assessment of Urban Rail Transit Construction Based on FMECA Technology[D]. Shijiazhuang, Shi-jiazhuang Tiedao University,2013.
[10] 张宇. 城市轨道交通工程施工风险评估方法的研究[D]. 北京: 华北电力大学(北京), 2017.
ZHANG Yu.Research on Risk Assessment of Urban Rail Transit Construction[D]. Beijing: North China Electric Power University, 2017.
[11] 梁宏浩. 地铁隧道施工安全风险评估及其应用研究[D]. 成都:西南交通大学,2017.
LIANG Honghao.Research on Safety Risk Assessment and Its Application in Subway Tunnel Construction[D].Chengdu: Southwest Jiaotong University, 2017.
[12] XU Z S, CHEN J. An overview of distance and similarity measures of intuitionistic fuzzy sets [J]. International Journal of Uncertainty, Fuzziness and Knowledge-Based Systems, 2008, 16(4): 529-555.
[13] PAPAKOSTAS G A, HATZIMICHAILIDIS A G, KABURLASOS V G. Distance and similarity measures between intuitionistic fuzzy sets: a comparative analysis from a pattern recognition point of view [J]. Pattern Recognition Letters, 2013, 34(14):1609-1622.
[14] HUANG C W, LIN K P, WU M C et al. Intuitionistic fuzzy c-means clustering algorithm with neighborhood attraction in segmenting medical image [J]. Soft Computing, 2015, 19(2):459-470.
[15] ATANASSOV K T. Intuitionistic fuzzy sets[J]. Fuzzy Sets and Systems, 1986, 20(1):87-96.
[16] ATANASSOV K T, GARGOU G. Interval valued intuitionistic fuzzy sets [J]. Fuzzy Sets and Systems, 1989, 31(3): 343-349.
[17] DAS S, DUTTA B, GUHA D. Weight computation of criteria in a decision-making problem by knowledge measure with intuitionistic fuzzy set and interval-valued intuitionistic fuzzy set [J]. Soft Computing, 2016, 20(9):3421-3442.
[18] XU Z S, YAGER R R. Intuitionistic and interval-valued intuitionistic fuzzy preference relations and their measures of similarity for the evaluation of agreement within a group[J]. Fuzzy Optimization Decision Making, 2009, 8(2):123-139.
[19] CHEN Z, YANG W. A new multiple attribute group decision making method in intuitionistic fuzzy setting[J]. Applied Mathematical Modelling, 2011, 35
(9):4424-4437.
[20] 徐泽水. 区间直觉模糊信息的集成方法及其在决策中的应用[J]. 控制与决策, 2007, 22(2):215-219.
XU Zeshui.Methods for aggregating interval-valued intuitionistic fuzzy information and their application to decision making[J]. Control and Decision, 2007, 22 (2):215-219. |