QIAO Jiangang, WANG Wei, LI Shixuan. Risk Assessment of Highway Construction Based on
Relative Difference Function[J]. Journal of Chongqing Jiaotong University(Natural Science), 2020, 39(07): 81-85.
[1] HAAS C, EINSTEIN H H. Updating the decision aids for tunneling[J]. Journal of Construction Engineering and Management, 2002, 128(1): 40-48.
[2] MCFEAT-SMITH I ,HARMAN K W.IMS risk evaluation system for financing and insuring tunnel projects[J].Tunneling and Underground Space Technology, 2004,19 (4/5):334.
[3] 杨莉琼,李世蓉,贾彬.基于二元决策图的建筑施工安全风险评估[J].系统工程理论与实践,2013,33( 7) : 1889-1 897.
YANG Liqiong, LI Shirong, JIA Bin. Safety risk assessment for construction project with BDD-based method[J].Systems Engineering-Theory & Practice, 2013,33 (7) 1889-1 897.
[4] 乔建刚,程璨.基于可拓学理论的简支梁桥安全评价模型研究[J].安全与环境学报,2018,18(6):2096-2102.
QIAO Jiangang, CHENG Can. Safety evaluation model of the simplified-propped beam bridges based on the extenics theory [J].Journal of Safety and Environment, 2018,18(6):2096-2102.
[5] 董娜,张宁,熊峰,等.基于熵权可拓理论的施工成本管理绩效评价[J]重庆交通大学学报(自然科学版),2019,38(2):51-58,78.
DONG Na, ZHANG Ning, XIONG Feng, et al. Performance evaluation of construction project cost management based on entropy weight extension theory[J].Journal of Chongqing Jiaotong University(Natural Science),2019,38(2):51-58,78.
[6] 白晓平,蒲涛.数据驱动的施工安全评价模型研究与应用[J].中国安全科学学报,2017,27(9):134-139.
BAI Xiaoping, PU Tao. Research on data-driven model for evaluation of construction safety and its application[J].China Safety Science Journal, 2017,27(9):134- 139.
[7] 张喜刚.公路桥梁和隧道工程设计安全风险评估[M].北京:人民交通出版社,2017,27(9):134-139.
ZHANG Xigang. Safety Risk Assessment of Highway Bridge and Tunnel Engineering Design[M].Beijing:China Communications Press, 2010:1-84
[8] 中交第一公路工程局有限公司.公路隧道施工技术规范:JTG F60—2009[S]. 北京:人民交通出版社,2009.
CCCC Fist Highway Engineering Group Co., Ltd.. Technical Specifications for Construction of Highway Tunnel :JTG F60—2009[S].Beijing: China Communications Press, 2009.
[9] 天津市建工工程总承包有限公司. 建筑施工安全检查标准: JGJ 59—2011[S]. 北京:中国建筑工业出版社,2011.
Tianjin Construction Engineering General Contracting Co., Ltd.. Standard for Construction Safety Inspection:JGJ 59—2011[S]. Beijing: China Architecture and Building Press,2011.
[10] 上海市建工设计研究院有限公司.建筑施工高处作业安全技术规范:JGJ 80—2016[S]. 北京:中国建筑工业出版社,2016.
Shanghai Construction Design and Research Institute Co., Ltd.. Technical Code for Safety of Working at Height of Building Construction: JGJ 80—2016[S]. Beijing: China Architecture and Building Press,2016.
[11] 天津市建工集团(控股)有限公司、天津市建工工程总承包有限公司.龙门架及井架物料提升机安全技术规范: JGJ 88—2010[S]. 北京:中国建筑工业出版社,2010.
Tianjin Construction Group,Tianjin Engineering & Construction Corporation.Technical Code for Safety of Gantry Frame and Headframe Hoisters:JGJ88-2010[S]. Beijing: China Architecture and Building Press, 2016.
[12] 沈阳建筑大学. 施工现场临时用电安全技术规范:JGJ 46—2005[S]. 北京:中国建筑工业出版社,2005.
Shenyang Jianzhu University. Technical Code for Safety of Temporary Electrification on Construction Site:JGJ 46—2005[S].Beijing: China Architecture and Building Press, 2005.
[13] 刘保国,沈铭龙,马强.模糊网络分析法在公路山岭隧道施工风险分析中的应用[J].岩石力学与工程学报,2014,33(增刊1):2861-2869.
LIU Baoguo, SHEN Minglong, MA Qiang. Application of fuzzy network analysis in risk analysis of highway mountain tunnel construction[J].Chinese Journal of Rock Mechanics and Engineering,2014,33(Sup1):2861-2869.
[14] 陈守煜.可变模糊集理论与模型及其应用[M].大连:大连理工大学出版社,2009.
CHEN Shouyu. Variable Fuzzy Set Theory and Model and Its Application[M]. Dalian:Dalian University of Technology Press,2009.