[1] GAVISH B, SHIFLER E. An approach for solving a class of transporta-tion scheduling problems[J]. European Journal of Operation Research,1978,3:122-134.
[2] FRRELING R, HUISMAN D, WAGELMANS A P M. Models and algorithms for integration of vehicle and crew scheduling[J]. Journal of Scheduling 2003,6:63-85.
[3] MESQUITA M, PAIXAO J M P. Exact algorithms for the multi-depot vehicle scheduling problem based on multicommodity network flow type formulations [C] ∥Lecture Notes in Economics and Mathematical System,1999,471:221-243.
[4] LOBEL A. Solving large-scale multi-depot vehicle scheduling probl-em[C]∥Lecture Notes in Economics and Mathematical System,1999,471:193-220.
[5] WEN M, LINDE E, ROPKE S, et al. An adaptive large neighborhood search heuristic for the electric vehicle scheduling problem[J]. Computers & Operations Research,2016, 76: 73-83.
[6] GERHARD H, JAKOB P, STEFAN R, et al. The electric fleet size and mix vehicle routing problem with time windows and recharging stations[J]. European Journal of Operational Research,2016, 252(3): 995-1018.
[7] MATTHIAS R, EVELIEN V D H, ALLAN L, et al. Electric bus fleet size and mix problem with optimization of charging infrastructure[J]. Applied Energy, 2018, 211:282-295.
[8] 孟越.纯电动公交车区域行车计划编制模型及算法研究[D].南京:东南大学,2015:1-89.
MENG Yue. Research on Regional Bus Scheduling Model and Algorithm Based on Pure Electric Vehicle[D]. Nanjing: Southeast University, 2015:1-89.
[9] ZUO Xingquan, CHEN Cheng, TAN Wei, et al.Vehicle scheduling of an urban bus line via an improved multi-objective genetic algorithm[J]. IEEE Transactions on Intelligent Transportation Systems, 2015,16(2): 1030-1041.
[10] ZHANG Jian, LI Wenquan, QIU Feng. Optimizing single-depot vehicle scheduling problem: Fixed-interval model and algorithm[J]. Journal of Intelligent Transportation Systems, 2013, 19(3):1-10.
[11] TANG Chunyan, CEDER A, ZHAO Shengchuan, et al. Vehicle scheduling of single-line bus service using operational strategies[J]. IEEE Transactions on Intelligent Transportation Systems, 2019,20(3): 1149-1159.
[12] AVISHAI C. Public-transport vehicle scheduling with multi vehicle type[J]. Transportation Research Part C: Emerging Technologies, 2011, 19(3):485-497.
[13] OMAR J, IBARRA R, RICARDO G, et al. An integrated approach for timetabling and vehicle scheduling problems to analyze the trade-off between level of service and operating costs of transit networks[J]. Transportation Research Part B: Methodological, 2014, 70(7):35-46.
[14] LIU Tao, AVISHAI C. Integrated public transport timetable synchroni-zation and vehicle scheduling with demand assignment: A bi-objective bi-level model using deficit function approach[J]. Transportation Research Part B: Methodological, 2018, 117:935-955. |