[1]Sharp A,Mainwaring G D.Method for the Accelerated Constructionof Ultra-Long Subsea Tunnels(Japan-Korea/China-Taiwan)[C].Seoul,Korea:3rd CECAR Conference,2004.
[2]Southwood A J.The Channel Tunnel,A Designer’s Perspective[M].Croydon:Mott MacDondld International Ltd.,1994.
[3]Hee Soon Shin.Use of Underground Space in Korea[M].Korea:Tunnels&Tunnelling International,