[1] 傅钢,曹延平,张林,等.地下水环境平衡的理念在高水压隧道设计中的应用[J].岩土力学,2007,28 (增刊1):474-478.
Fu Gang,Cao Yanping,Zhang Lin.The idea of underground water environmental balance applied to the design of the tunnel under high hydrostatic pressures [J].Rock and Soil Mechanics,2007,28(Sup1):474-478.
[2] 蒋忠信.隧道工程与水环境的相互作用[J].岩石力学与工程学报,2005,24(1):121-127.
Jiang Zhongxin.Interaction between tunnel engineering and water environment [J].Chinese Journal of Rock Mechanics and Engineering,2005,24(1):121-127.
[3] 蒋忠信,崔鹏.山区道路工程与环境协调的设计原理[J].铁道工程学报,2006,2(1):4-10.
Jiang Zhongxin,Cui Peng.Design principles on the coordinating between road engineering and environment in mountain area [J].Journal of Railway Engineering Society,2006,2(1):4-10.
[4] 朱大力,李秋枫.预测隧道涌水量的方法[J].工程勘察,2000(4):18-22.
Zhu Dali,Li Qiufeng.Method to predict discharge rate of tunnel [J].Geotechnical Investigation and Surveying,2000 (4):18-22.
[5] 朱大力,李秋枫.日本开发出预测隧道涌水量的非稳定流法[J].铁路地质与路基,1994(2):29-30.
Zhu Dali,Li Qiufeng.A non-stable flow method to predict discharge rate of tunnel [J].Geology and Subgrade of Railway,1994(2):29-30.
[6] 王纯祥,蒋宇静,江琦哲郎,等.复杂条件下长大隧道涌水预测及其对环境影响评价[J].岩石力学与工程学报,2008,27(12):2411-2417.
Wang Chunxiang,Jiang Yujing,ESAKI Testuro.Prediction of groundwater inflow in long tunnel and its influence on environment under complex conditions [J].Chinese Journal of Rock Mechanics and Engineering,2008,27(12):2411-2417.
[7] 来弘鹏,康佐,谢永利,等.地铁区间隧道黄土地层注浆预加固技术研究[J].中国铁道科学,2014,35(1):47-53.
Lai Hongpeng,Kang Zuo,Xie Yongli,et al.Grouting pre-reinforcement technology for metro tunnel in loess strata [J].China Railway Science,2014,35(1):47 -53.
[8] 张保圆,任建喜,王博.二重管水平注浆加固技术在地铁隧道穿越地裂缝处治中的应用[J].现代隧道技术,2009,46(4):94 -98.
Zhang Baoyuan,Ren Jianxi,Wang Bo.Application of duplex pipe grouting for a subway tunnel to traverse ground fissures [J].Modern Tunneling Technology,2009,46(4):94 -98.
[9] 王全胜,肖红渠.二重管垂直注浆技术及注浆机理探讨[J].岩土工程学报,2008,30(增刊1):536-539.
Wang Quansheng,Xiao Hongqu.Technique and mechanism of double rod vertical injection grouting [J].Chinese Journal of Rock Mechanics and Engineering,2008,30(Sup1):536-539.
[10]张成平,张顶立,王梦恕,等.高水压富水区隧道限排衬砌注浆圈合理参数研究[J].岩石力学与工程学报,2007,26(11):2270-2276.
Zhang Chengping,Zhang Dingli,Wang Mengshu,et al.Study on appropriate parameters of grouting circle for tunnels with limiting discharge lining in high water pressure and water-enriched region [J].Chinese Journal of Rock Mechanics and Engineering,2007,26(11):2270-2276.
[11]JTG E 40—2007公路土工试验规程[S].北京:人民交通出版社,2007.
JTG E 40—2007 Test Methods of Soils for Highway Engineering [S].Beijing:China Communications Press,2007. |