[1]李林轶.模糊综合评价在桥涵补充定额编制中的应用研究[D].西安:长安大学公路学院,2009.
[2]汪应洛.系统工程理论、方法及应用[M].北京:高等教育出版社,1998.
[3]慕金波.层次分析法在评定最优环境工程方案中的应用[J].环境科学进展,1997(4):33-40.
MU Jin-bo.Application of analytical hierarchy process method forselecting the optimal environmental engineering science[J].Ad-vances in Environmental Science,1997(4):33-40.
[4]孙东生,朱懿,周水兴.基于指数标度的层次分析法在桥梁评定中的应用[J].重庆交通大学学报:自然科学版,2010,29(6):867-870.
SUN Dong-sheng,ZHU Yi,ZHOU Shui-xing.Application of ex-ponential scale of AHP in bridge evaluation[J].Journal ofChongqing Jiaotong University:Natural Science,2010,29(6):867-870.
[5]Saaty T L.An exposition of the AHP in reply to the paper remarkson the analytic hierarchy process[J].Management Science,1990,36(3):259-268.
[6]曾蓉,陈洪凯,李俊业.熵权模糊综合评价法在公路洪灾危险性评价中应用[J].重庆交通大学学报:自然科学版,2010,29(4):587-591.
ZENG Rong,CHEN Hong-kai,LI Jun-ye.Fuzzy comprehensiveevaluation method based on entropy in road flood risk assessment[J].Journal of Chongqing Jiaotong University:Natural Science,2010,29(4):587-591.
[7]王旭,霍德利.模糊综合评价法在煤矿安全评价中的应用[J].中国矿业,2008,27(5):75-78.
WANG Xu,HUO De-li.Application of fuzzy comprehensive eval-uation in coal safety assessment[J].China Mining Magazine,2008,27(5):75-78.
[8]何夕平.模糊综合评价在选择最优施工方案中的应用[J].合肥工业大学学报:自然科学版,2000,23(6):1050-1054.
HE Xi-ping.Application of fuzzy comprehensive evaluation to se-lecting the optimal construction plan[J].Journal of Hefei Univer-sity of Technology:Natural Science,2000,23(6):1050-1054.
[9]李玉琳,高志刚,韩延玲.模糊综合评价中权值确定和合成算子选择[J].计算机工程与应用,2006,23(5):38-43.
LI Yu-lin,GAO Zhi-gang,HAN Yan-ling.The determination ofweight value and the choice of composite operators in fuzzy compre-hensive evaluation[J].Computer Engineering and Application,2006,23(5):38-43.
|