Journal of Chongqing Jiaotong University(Natural Science) ›› 2009, Vol. 28 ›› Issue (3): 508-511.DOI: 10.3969/j.issn.1674-0696.2009.03.09
Previous Articles Next Articles
YANG Xing, ZHANGMin, ZHOU Shui-xing
Received:
Revised:
Online:
Published:
杨兴,张敏,周水兴
作者简介:
Abstract: In?order?to?improve?the?structure?security?and?guarantee?the?girder's?safety?in?the?construction?of?cable-stayed?bridges,?cables?should?be?tensioned?twice?and?then?the?expected?completed?state?can?be?achieved?at?last.?A?good?method?is?proposed?to?calculate?the?cable?tension?forces?and?the?adjusted?order.?Based?on?the?theory?of?influence?matrix,?an?optimized?control?model?to?solve?the?second?cable?adjustment?is?established,?and?the?method?of?penalty?function?is?used.?This?method?has?many?advantages,?such?as?high?preciseness,?convenience?and?practice?etc.?,?which?can?also?be?used?to?minimize?the?error?of?the?cable?tension?force?at?the?completed?state.
Key words: cable-stayed bridge , secondary cable-adjustment , completed state , influence matrix method , penalty function method ;
摘要: 在斜拉桥施工过程中为增大结构的安全储备并保证主梁受力安全,对斜拉索采用两次张拉,最终实现预想的 成桥状态,由此提出二次调索施调索力、顺序的计算问题。以影响矩阵理论为基础,建立了二次调索最优控制的数 学模型,采用惩罚函数法求解,该方法计算精确、简便、实用,也可用于成桥后索力的误差调整。
关键词: 斜拉桥, 二次调索, 成桥状态, 影响矩阵法, 惩罚函数法
CLC Number:
U448.27
YANG Xing, ZHANGMin, ZHOU Shui-xing. Application?of?Influence?Matrix?Method?to?Secondary??Cable-Adjustment?of?Cable-Stayed?Bridges[J]. Journal of Chongqing Jiaotong University(Natural Science), 2009, 28(3): 508-511.
杨兴,张敏,周水兴. 影响矩阵法在斜拉桥二次调索中的应用[J]. 重庆交通大学学报(自然科学版), 2009, 28(3): 508-511.