[1] |
ZHANG Min1, XU Nuo1, ZHOU Linqi1, HAN Yu1,2.
Influence of Inserting Steel Plates on the Cable Force and
Alignment of Main Arch
[J]. Journal of Chongqing Jiaotong University(Natural Science), 2020, 39(06): 53-58.
|
[2] |
ZHANG Min, ZHANG Hongxin, LIU Yongzhen, LEI Lin.
Experimental Research on Internal Piezoelectric Cantilever Energy
Harvesting From FIV
[J]. Journal of Chongqing Jiaotong University(Natural Science), 2018, 37(12): 133-137.
|
[3] |
ZHOU Qian1,2,ZHOU Shuixing1,LI Xiaoqing1,FENG Yushi2.
Study on Construction Mechanical Properties of Cantilever-Pouring
Concrete Arch Bridge
[J]. Journal of Chongqing Jiaotong University(Natural Science), 2018, 37(07): 9-13.
|
[4] |
WANG Ling, WANG Tao, WANG Rongxia.
Linear Control Method of Cantilever Assembly of Long Span Continuous Steel Truss Bridge
[J]. Journal of Chongqing Jiaotong University(Natural Science), 2017, 36(11): 11-15.
|
[5] |
LIU Chen-guang,ZHOU Zhi-xiang,MAO Jiu-qun.
Interaction between Integral Cantilever Structure and Rock-Soil
[J]. Journal of Chongqing Jiaotong University(Natural Science), 2011, 30(6): 1303-1305.
|
[6] |
ZHOU Man ,WANG Fu-min ,WANG Peng ,SONG Jun ,ZHAO Yan-lei ,LIU jing.
Sensitivity Analysis on Error in Cantilever Erection
of Curve Prestressed Continuous Girder Bridge
[J]. Journal of Chongqing Jiaotong University(Natural Science), 2011, 30(6): 1306-1310.
|
[7] |
YOU Tao,ZHOU Zhi-xiang,ZHENG Wen.
New Technology of Widening Mountainous Highway with Side Slope Trellis
Base Cantilevered Structures
[J]. Journal of Chongqing Jiaotong University(Natural Science), 2011, 30(1): 74-77.
|
[8] |
WANG Cun-shu, SUN Yu-xiang.
One-Time?Tensioning?Formation?Technology?of?Single?Steel?Strand?Wire?of??Anchor?Cable?of?Steel?Cantilever?Installed?Truss?Arch?Bridge
[J]. Journal of Chongqing Jiaotong University(Natural Science), 2009, 28(5): 840-843.
|
[9] |
ZHANG Ming, DENG Lei-lei, LIHua, SHEN Pu-sheng.
Effect?of?Axial?Pressure?Force?on?Horizontal??Displacement?of?Cantilever?Column
[J]. Journal of Chongqing Jiaotong University(Natural Science), 2009, 28(3): 501-504.
|
[10] |
XIAO Xing-xing, WAN Chong-wen, LI Cheng-hua.
Analysis on Hyper Static Axial Force in Long Multi-span prestressed Concrete Continuous Box Beam Bridge
[J]. Journal of Chongqing Jiaotong University(Natural Science), 2008, 27(3): 338-344.
|
[11] |
ZHANG Qiu-ling ,XIAO Guong-hong ,HUANG Ming-hai.
The Application and Functional Expand of Truss Frame Platform
[J]. Journal of Chongqing Jiaotong University(Natural Science), 2007, 26(1): 40-43.
|
[12] |
WANG Hao,XIAO Guang-hong,ZHANG Qiu-ling.
Design and Installation of Hanging Basket of Fuling Wujiang Second Bridge
[J]. Journal of Chongqing Jiaotong University(Natural Science), 2006, 25(增刊1): 24-27.
|
[13] |
ZENG De rong1, CAO Xiao chuan2.
Computation of highth of the bridge model in construction
[J]. Journal of Chongqing Jiaotong University(Natural Science), 2001, 20(2): 19-21.
|
[14] |
LIU Dong, MENG Yun.
The construction method research of the Wujiang P. F. C cable-stayed and suspension cambination bridge
[J]. Journal of Chongqing Jiaotong University(Natural Science), 1999, 18(4): 96-102.
|
[15] |
Lia Hua.
Research on Computer Aided Lock Design(3)
[J]. Journal of Chongqing Jiaotong University(Natural Science), 1994, 13(3): 96-102.
|