中文核心期刊
CSCD来源期刊
中国科技核心期刊
RCCSE中国核心学术期刊

Journal of Chongqing Jiaotong University(Natural Science) ›› 2007, Vol. 26 ›› Issue (3): 33-35.

Previous Articles     Next Articles

The Select and Design of the Traveler of Wujiang Second Bridge in Fuling

LI Xiao-liang,XIANG Guang-hong,ZHANG Qiu-ling   

  1. Chongqing Jiaotong University,Chongqing 400074,China
  • Received:2006-06-01 Revised:2006-06-30 Online:2007-06-15 Published:2015-05-18

涪陵乌江二桥施工挂篮方案选定及设计

李晓亮,肖光宏,张秋陵   

  1. 重庆交通大学,重庆 400074
  • 作者简介:李晓亮(1981—),男,山西交城人,研究生,从事结构工程方向研究.

Abstract: Presents the main girder structure of Fuling Wujiang Second Bridge,which is prestressed concrete cable。stayed bridge with twin pylons and single cable plane.Based on the comparison with the Yamen Bridge in Guangdong,the traveler construction scheme of the Wujiang Second Bridge was designed,and the design of the traveler was introduced in detail.

Key words: Wujiang Second Bridge, cable-stayed bridge, traveler, main girder

摘要: 介绍了涪陵乌江二桥双塔单索面斜拉桥主梁的构造,通过与广东崖门大桥的对比,确定了涪陵乌江二桥主梁 施工挂篮方案,并详细介绍了挂篮的设计.

关键词: 乌江二桥, 斜拉桥, 挂篮, 主梁

CLC Number: