[1] 陈洁金,周峰,阳军生,等.山岭隧道塌方风险模糊层次分析[J].岩土力学,2009,30(8):2365-2370.
Chen Jiejin, Zhou Feng, Yang Junsheng, et al. Fuzzy analytic hierarchy process for risk evaluation of collapse during construction of mountain tunnel [J]. Rock and Soil Mechanics,2009,30(8):2365-2370.
[2] 周建昆,吴坚.岩石公路隧道塌方风险事故树分析[J].地下空间与工程学报,2008,4(6):991-998.
Zhou Jiankun, Wu Jian. Fault tree analysis of the collapse risk in rock highway tunnel [J]. Chinese Journal of Underground Space and Engineering,2008,4(6):991-998.
[3] 郝书亮.基于层次分析法的公路隧道塌方风险分析[J].低温建筑技术,2012(7):152-154.
Hao Shuliang. Analysis of the collapse risk in highway tunnel based on analytic hierarchy process [J]. Low Temperature Architecture Technology,2012(7):152-154.
[4] 曹文贵,翟友成,王江营,等.山岭隧道塌方风险的集对分析方法[J].中国公路学报,2012,25(2):90-99.
Cao Wengui, Zhai Youcheng, Wang Jiangying, et al. Method of set pair analysis for collapse risk during construction of mountain tunnel [J]. China Journal of Highway and Transport,2012,25(2):90-99.
[5] 彭立敏,安永林,张运良,等.可拓法识别勘测阶段隧道瓦斯突出的模型与实例[J].土木工程学报,2008,41(4):81-85.
Peng Limin, An Yonglin, Zhang Yunliang, et al. Identification of gas burst in tunnel at the prospecting stage by using extension theory: a case study [J]. China Civil Engineering Journal 2008,41(4):81-85.
[6] 张胜, 陈修和,汪波,等.明堂山隧道塌方风险评估及控制措施建议[J].地下空间与工程学报,2012,8(增刊1):1567-1570,1620.
Zhang Sheng, Chen Xiuhe, Wang Bo, et al. Collapse risk evaluation and its control measures for Mingtangshan tunnel [J]. Chinese Journal of Underground Space and Engineering,2012,8(S1):1567-1570,1620.
[7] 郭亚军.综合评价理论、方法及拓展[M].北京:科学出版社,2012.
Guo Yajun. Comprehensive Evaluation Theory, Methods and Extensions [M].Beijing: Science Press,2012.
[8] 交通运输部.《关于在初步设计阶段实行公路桥梁和隧道工程安全风险评估制度的通知》(交公路发[2010]175号)[EB/OL].[2010-12-04].http://xxgk.ganxian.gov.cn/bmgkxx/jtj/fgwj/gfxwj/201012/t20101204_56342.htm.
Ministry of Transport of the People’s Republic of China. The notification about implementing security risk assessment system of highway bridge and tunnel engineering in preliminary design stage (Highway Administration Bureau of Ministry of Transport, No. 175 [Z]. [EB/OL].[2010-12-04]. http://xxgk.ganxian.gov.cn/bmgkxx/jtj/fgwj/gfxwj/201012/t20101204_56342.htm.
[9] 赵克勤.集对分析及其初步应用[M].杭州:浙江科学技术出版社,2000.
Zhao Keqin.Set Pair Analysis and Its Preliminary Application [M].Hangzhou: Zhejiang Science and Technology Press,2000.
[10]樊治平,潘德慧.不确定性判断矩阵权重计算的一种实用方法[J].系统工程,1996,14(2):57-61.
Fan Zhiping, Pan Dehui.A practical approach of calculating weights in uncertain judgment matrix [J].Systems Engineering,1996,14(2):57-61.
[11]王家远,王宏涛.基于不确定AHP的建设项目风险模糊综合评判[J].深圳大学学报:理工版,2006,23(1):48-52.
Wang Jiayuan,Wang Hongtao.Fuzzy comprehensive evaluation for construction project risks based on uncertainty AHP [J]. Journal of Shenzhen University: Science & Engineering, 2006, 23(1): 48-53.
[12]李德顺.基于广义集对分析的系统危险性评价研究[D]. 沈阳:东北大学,2010.
Li Deshun. Research on System Risk Assessment Based on General Set Pair Analysis [D]. Shenyang: Northeastern University,2010.
|