[1] 周泽民. 水泥混凝土路面与沥青路面的对比分析[J].中南公路工程,1989(3): 11-13.
ZHOU Zeming. Comparative analysis of cement concrete pavement and asphalt pavement[J].Central South Highway Engineering, 1989(3):
11-13.
[2] 范小响,罗翥,傅智,等.水泥混凝土路面预制拼装快速修复技术研究[J].公路交通科技(应用技术板),2006(1) : 33-38
FAN Xiaoxiang, LUO Zhu, FU Zhi, et al. Quick fix technical research of assembling precast concrete pavement[J].Highway and
Transportation Research(Applied Technology Edition),2006(1):33-38.
[3] 王俏.水泥混凝土路面预制拼装快速修复技术研究[J].长沙交通学院学报,2007,23(4) :33-38.
WANG Qiao. Study of rapid repair technology for precasted assembling slab of cement concrete pavement[J].Journal of Changsha
Communications University,2007,23(4):33-38.
[4] 吴德芬,罗翥,彭鹏. 预制拼装技术在水泥混凝土路面快速养护中的应用研究[J].公路交通科技(应用技术板), 2011,7(2):8-11.
WU Defen, LUO Zhu, PENG Peng. Application of pre-assembly technology In cement concrete pavement rapid maintenance[J].Technology of
Highway and Transport(Applied Technology Edition),2011,7(2):8-11.
[5] TAYABJI S, BUCH N,KOHLER E. Precast concrete pavement for intermittent concrete pavement repair applications[C]//National
Conference on Preservation, Repair, and Rehabilitation of Concrete Pavements. Washington, DC : The National Academies of Sciences,
Engineering, and Medicine ,2009.
[6] KOHLER E, HARVEY J,DU PLESSIS L, et al.Comparison of precast and cast-in-place concrete pavements responses under heavy vehicle
simulator loads[C]//The 8th International Conference on the Bearing Capacity of Roads, Railways & Airfields International
Conference. Champaign , Illinois, USA:[s.n.], 2009.
[7] CHANG L, CHEN Y, LEE S. Using Precast Concrete Panels for Pavement Construction in Indiana[R].West Lafayette,IN:Joint
Transportation Research Program,2004.
[8] 尹锦明,姜毅,韩光义. 装配式水泥混凝土路面板块吊装应力分析[J].施工技术,2015,44(增刊1): 393-396.
YIN Jinming, JIANG Yi, HAN Guangyi. Stress analysis of fabricated cement concrete pavement slab in the progress of lifting [J].
Construction Technology, 2015, 44(Sup1): 393-396.
[9] 黄晓明,邓学钧. 刚性道面接缝传荷能力的疲劳规律[J].中国公路学报,1995,8(2): 32-34.
HUANG Xiaoming, DENG Xuejun. The law of rigid pavement fatigue load transfer joints [J]. Journal of Chinese Highway, 1995, 8(2): 32
-34.
[10] 刘丹. 水泥混凝土路面接缝及结构优化研究[D].武汉:武汉理工大学,2003.
LIU Dan.Researches on the Optimum Joint and Structure of Cement Concrete Pavement[D].Wuhan:Wuhan University of Technology,2003.
[11] 宋亚君,马松林,李新凯.水泥混凝土路面极限荷载与应力分析[J].低温建筑技术,2008,30(5):64-66.
SONG Yajun, MA Songlin, LI Xinkai. Analysis of ultimate load and stress of cement concrete pavement[J].Low Temperature Architecture
Technology,2008,30(5):64-66.
[12] 卢正宇,张起森.水泥混凝土路面企口接缝的应力分析[J].长沙交通学院学报,1994,10(3):68-75.
LU Zhengyu, ZHANG Qisen. Stress Analysis of joints in cement concrete pavement[J].Journal of Changsha Institute of Transportation,
1994, 10(3): 68-75. |