Simulate calculation study of cable-stayed force for arch bridge segmental construction
ZHOU Shui-xing, JIANG Li-zhong, ZENG Zhong, ZHOU Jian-ting
2000, 19(3):
8-12.
Cable-stayed is used to cable suspension,but cable force is calculated by manual,and only for less than 5 segments,and the prescion is poor.This paper puts forward "Zero moment Method",which can not only calculate more segmental soupe force,but both temporary joint and fixed joint during construction.The Mechanical concept is clear,and it is easy for calculating.It is fit for program,and the illustrations prove that the methods are right.