[1] 李晓刚,董超芳,肖葵,等.金属大气腐蚀初期行为与机理[M].北京:科学出版社,2009:23-30.
Li Xiaogang,Dong Chaofang,Xiao Kui,et al.Early Corrosion Behavior and Mechanism of the Metal in the Atmosphere [M].Beijing:Science Press,2009:23-30.
[2] Suzumura K,Nakamura Shun-ichi.Environmental factors affecting corrosion of galvanized steel wires [J].Journal of Materials in Civil Engineering,2004,16(1):1-7.
[3] 黎学明,陈大华,陈建文,等.模拟酸雨溶液中温度对桥梁索缆镀锌钢丝腐蚀行为影响[J].腐蚀科学与防护技术,2010,22(1):14-17.
Li Xueming,Chen Dahua,Chen Jianwen,et al.Effect of temperature on corrosion behavior of galvanized steel bridge wires in simulated acid rain [J].Corrosion Science and Protection Technology,2010,22(1):14-17.
[4] 朱世东,尹志幅,白真权,等.温度对P110钢腐蚀行为的影响[J].中国腐蚀与防护学报,2009,29(6):493-450.
Zhu Shidong,Yin Zhifu,Bai Zhenquan,et al.Influences of temperature on the corrosion behavior of P110 steel [J].Journal of Chinese Society for Corrosion and rotection,2009,29(6):493-450.
[5] 刘强.模拟酸雨溶液中大跨度斜拉桥拉索钢绞线腐蚀行为研究[D].重庆:重庆交通大学,2007.
Liu Qiang.Study on Bridge Cable Steel Wires Corrosion Behavior in Simulated Acid Rain and Service Life Prediction [D].Chongqing:Chongqing Jiaotong University,2007.
[6] 黎学明,刘强,孔令峰,等.模拟酸雨溶液中应力对镀锌钢绞线腐蚀行为影响[J].腐蚀科学与防护技术,2008,20(1):44-46.
Li Xueming,Liu Qiang,Kong Lingfeng,et al.Corrosion behavior of galvanized steel under stress in simulated acid rain solution [J].Corrosion Science and Protection Technology,2008,20(1):44-46.
[7] Brock D.工程断裂力学基础[M].王克仁,译.北京:科学出版社,1980:294-304.
Brock D.Engineering Foundation of the Fracture Mechanics [M].Wang Keren,translations.Beijing:Science Press,1980:294-304.
[8] 黎学明,周杰敏,刘强,等.张力对斜拉桥拉索镀锌钢绞线腐蚀行为影响[J].电化学,2007,13(3):297-304.
Li Xueming,Zhou Jieming,Liu Qiang,et al.Effect of tension on corrosion behavior of galvanized steel wire for cable-stayed bridge [J].Electrochemistry,2007,13(3):297-304.
[9] Yang W J,Yang P,Li X M,et al.Influence of tensile stress on corrosion behavior of high-strength galvanized steel bridge wires in simulated acid rain [J].Materials and Corrosion,2012,63(5):401-408.
[10]Betti R,West A C,Vermaas G,et al.Corrosion and embrittlement in high-strength wires of suspension bridge cables [J].Journal of Bridge Engineering,2005,10(2):151-162.
[11]沈平,译.英国M48塞文桥主缆检查与修复[J].世界桥梁,2011(5):120-125.
Shen Ping,translation.The inspection and repair of the British M48 Severn bridge main cable [J].World Bridges,2011(5):120-125.
[12]聂丽芳.悬索桥主缆二次应力分析与研究[D].成都:西南交通大学,2010.
Nie Lifang.The Analysis and Investigation of Secondary Stress of Suspension Bridge [D].Chengdu:Southwest Jiaotong University,2010.
[13]严琨,沈锐利,闫勇.大跨度悬索桥鞍座出口处主缆的二次应力[J].重庆交通大学学报:自然科学版,2012,31(2):192-197.
Yan Kun,Shen Ruili,Yan Yong.Secondary stress of the first segment main cable near the saddles in long-span suspension bridge [J].Journal of Chongqing Jiaotong University:Natural Science,2012,31(2):192-197.
|