[1] 刘洁.基于属性约束的公路造价优化控制方法研究与仿真[J].科技通报,2014,30(2):38-40.
LIU Jie. Highway cost optimization control method and simulation based on the attribute constraints[J]. Bulletin of Science and Technology, 2014, 30(2): 38-40.
[2] 魏道升,李淑燕.基于灰色关联分析的工程造价控制[J].重庆交通大学学报(自然科学版),2013,32(2):321-324.
WEI Daosheng, LI Shuyan. Construction cost control based on grey correlation analysis[J]. Journal of Chongqing Jiaotong University(Natural Science), 2013, 32(2): 321-324.
[3] 杨华龙,刘金霞,郑斌.灰色预测GM(1,1)模型的改进及应用[J].数学的实践与认识,2011,41(23):39-46.
YANG Hualong, LIU Jinxia, ZHENG Bin. Improvement and application of grey prediction GM(1,1) model[J]. Mathematics in Practice and Theory, 2011, 41(23): 39-46.
[4] 刘婧,叶青.采用BP和RBF神经网络的厦门市工程造价预测模型[J].华侨大学学报(自然科学版),2013,34(5):576-580.
LIU Jing, YE Qing. Project cost prediction model based on BP and RBP neural networks in Xiamen city[J]. Journal of Huaqiao University(Natural Science), 2013, 34(5): 576-580.
[5] 王建茹.基于BP神经网络的建设工程造价预测方法[J].沈阳建筑大学学报(社会科学版),2014,16(1):42-45.
WANG Jianru. Prediction method of construction cost based on BP neural network[J]. Journal of Shenyang Jianzhu University(Social Science), 2014, 16(1): 42-45.
[6] 舒隽,甘磊.极限学习机方法在电力线路建设成本估算中的应用研究[J].现代电力,2011,28(4):78-83.
SHU Jun, GAN Lei. Research on cost estimation of power lines construction projects based on extreme learning machine method[J]. Modern Electric Power, 2011, 28(4): 78-83.
[7] 胡庆国,宋新智.基于优化极限学习机的高速公路造价预测[J].公路与汽车,2014(2):208-213.
HU Qingguo, SONG Xinzhi. Highway construction cost prediction based on optimization of extreme learning machine[J]. Highways & Automotive Applications, 2014(2): 208-213.
[8] 周建永.支持向量机修正灰色模型在工程价格预测中的应用[J].科技通报,2013,29(7):147-150.
ZHOU Jianyong. Support vector machine grey model in the application of engineering price forecast[J]. Bulletin of Science and Technology, 2013, 29(7): 147-150.
[9] 郝宽胜,张桐林.基于模糊最小二乘支持向量机的建设工程造价快速预测方法研究[J].铁路工程造价管理,2012,27(3):1-4.
HAO Kuansheng, ZHANG Tonglin. Research on project cost fast forecasting method based on the fuzzy least square support vector machine[J]. Railway Engineering Cost Management, 2012, 27(3): 1-4.
[10]黄崇,甘国融.基于PCA-BP的高速公路工程造价预测模型[J].公路与汽运,2014(5):210-214.
HUANG Chong, GAN Guorong. Predicting construction cost model for high-speed road based on PCA-BP[J]. Highways & Automotive Applications, 2014(5): 210-214.
[11] 段晓晨,郭兰英,张新宁.新建高铁工程非线性造价估算方法研究[J].铁道学报,2013,35(10):114-122.
DUAN Xiaochen, GUO Lanying, ZHANG Xinning. Research on nonlinear estimating methods of whole life-cycle cost for China high-speed railway project [J]. Journal of the China Railway Society, 2013, 35(10): 114-122.
[12]彭丽群,张欣莉.基于贡献分析的神经网络集成法在工程造价预测中的研究[J].经营管理者,2009(22): 173-177.
PENG Liqun, ZHANG Xinli. Contribution analysis based neural network integration means research in engineering cost prediction[J]. Manager’ Journal, 2009(22): 173-177.
[13] ZHANG Yonghong, XIA Zhining, QIN Litang, et al. Prediction of blood-brain partitioning: a model based on molecular electronegativity distance vector descriptors[J]. Journal of Molecular Graphics and Modelling, 2010, 29(2): 214-220.
[14]CHONG L G, JUN C H. Performance of some variable selection methods when multicollinearity is present[J]. Chemometrics and Intelligent Laboratory Systems, 2005, 78(1/2): 103-112.
[15]姚旭,王晓丹,张玉玺,等.基于AdaBoost和匹配追踪的选择性集成算法[J].控制与决策,2014,29(2):208-214.
YAO Xu, WANG Xiaodan, ZHANG Yuxi, et al. Selective ensemble algorithm based on AdaBoost and matching pursuit[J]. Control and Decision, 2014, 29(2): 208-214. |