中文核心期刊
CSCD来源期刊
中国科技核心期刊
RCCSE中国核心学术期刊

Journal of Chongqing Jiaotong University(Natural Science) ›› 2004, Vol. 23 ›› Issue (6): 90-96.

Previous Articles     Next Articles

The research of principle of process structure analysis of highway projectbase on nerve tree

WANG Shou-xu   

  1. School of Highway Engineering, Changsha University of Science & Technology, Hunan Changsha 410076, China
  • Received:2004-01-19 Online:2004-12-15 Published:2015-05-18

基于神经树的公路工程项目工序结构解析的原则

王首绪   

  1. 长沙理工大学公路学院,湖南长沙410076
  • 作者简介:王首绪(1964—),男,湖北荆州人,副教授,硕士,从事公路工程经济与管理教学科研工作。

Abstract: Because the needs of using unit are distinction, project work systems are difficulty to unite thought the highway proceed , so action are distinction on differ area and differ project, and operations are disorder in management. In This paper , using nerve tree , study the method and principle normalization of breakdown, from needs of work systems

Key words: work systems, nerve tree, breakdown principle

摘要: 公路工程实施过程中,项目工序系统由于使用单位的需求不同而难于统一,致使不同地域、不同项目的做法 不尽相同,导致在实施管理过程中操作混乱。本文利用神经树原理,从工序系统的需求出发,就怎样标准化项目工 序结构的解析方法、解析原则做了运用研究。

关键词: 工序系统, 神经树, 解析原则

CLC Number: